Laserfiche WebLink
SPILL CATEGORYDETERMINATION DIAGRAM <br />Upon receiving a call after normal working hours to respond to any sewer spill, the <br />designated primary on-callemployeeshall immediately contact the on-callwater <br />resources maintenance supervisor and inform him of the sewer spill event. The primary <br />on-call employee shall then call the rest of the on-call crew and they shall report directly <br />to the City Yard. They shallretrieve a vacuumtruck and a bobtail truck with appropriate <br />sewer spill response equipment to the sewer spill location. <br />The intent is to reduce the response time required to move the necessary equipment and <br />manpower to the sewer spill locationand to minimize the sewer spill time.It is mandatory <br />for the on-call water resources maintenance supervisor to attend the sewer spill site and <br />take over the spill response operation upon his arrival. <br />During normal working hours all phone calls and coordination will be handled by a Public <br />Works Agency (PWA)-Water Resources MaintenanceSupervisor. <br />REVISION 2.0 (4/23)6 <br /> <br />