My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />SPECIAL PROVISIONS - SANITARY SEWER IMPROVEMENTS <br />6.01 OPEN TRENCH OPERATIONS, EXCAVATION, BEDDING, AND BACKFILL <br />Open trench operations, excavation, bedding and backfill shall conform to the applicable <br />provisions of Section 306 of the Standard Specifications and these Special Provisions. <br />All trenches shall be base paved with hot mix or covered with steel traffic plates recessed <br />and flushed with existing pavement at the end of each working day. No temporary <br />pavement will be allowed. <br />Trenching operations shall not be allowed on more than one street at any time. Work shall <br />not be allowed in more than one intersection at any one time. <br />The third paragraph of Subsection 306-1.1.1 of the Standard Specifications is hereby <br />deleted and replaced as follows: <br />Excavation shall include the removal of all excess excavated materials and all water <br />and materials of any nature which interfere with the construction work. <br />All pavement removals shall be sawcut unless, approved otherwise by the Engineer prior <br />to commencement of work. <br />All removed pavement and excess excavated material shall be immediately disposed of off <br />the project site at a legal dumpsite at the Contractor's expense. <br />Pipe bedding: <br />Unless otherwise secified or shown on the plans, for VCP sewer the pipe bedding material <br />shall be 3/a" crushed rock; if installed in high groundwater conditions the bedding material <br />shall be'/2" crushed rock wrapped in geofabric (Mirafi 140N or approved equal). For PVC <br />and ductile iron pipe sewers, the pipe bedding material shall be imported SE-30 sand. <br />Pipe Zone Backfill: <br />Unless otherwise specified or shown on the plans, for VCP sewer, the pipe zone backfill <br />material shall be 3/4" crushed rock; if installed in high groundwater conditions the pipe zone <br />backfill material shall be 1/2" crushed rock wrapped in geofabric (Mirafi 140N or approved <br />equal.) For PVC and ductile iron pipe sewers, the pipe zone backfill material shall be <br />imported SE-30 sand. <br />Trench Zone Backfill: <br />The trench zone backfill shall be Class II aggregate base. <br />All material tickets (i.e. Sand, Class II Base, Crushed Rock, Asphalt, Concrete, etc.) shall <br />be given to the City Inspector on a daily basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.