Laserfiche WebLink
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />The submittal shall include but not be limited to the following: <br />1. Sewer plugging method and types of plug. <br />2. Number, size, material, location and method of installation of suction piping. <br />3. Number, size, material, location and method of installation of discharge piping. <br />4. Bypass pump sizes, capacity, number of each size to be on -site and power <br />requirements. <br />5. Calculations of static lift, friction losses, and flow velocity (pump curves showing <br />pump operating range shall be submitted). <br />6. Standby power generator size. <br />7. Method of protecting discharge manholes or structures from erosion and damage. <br />8. Thrust block sizes and restraining lengths of pipes and locations (if necessary). <br />9. Method of noise control for each pump and/or generator. <br />10. Any temporary pipe supports and anchoring requirements. <br />11. Design plans and computations for access to bypass pumping locations indicated <br />on the drawings. <br />12. Calculations for selection of bypass pumping pipe size. <br />13. Schedule for installation of and maintenance of bypass pumping piping. <br />14. Submit a sewer overflow emergency response plan. The plan will dictate backup <br />pumping plans, spill containment procedures, spill recovery procedures and <br />emergency call out phone numbers. <br />Provision shall be made by the Contractor for the collection of sewage from cutoff lateral <br />sewers. Lateral sewers shall be reconnected to the main before the termination of every <br />working day. <br />The text of Subsection 306-1.6 of the Standard Specifications is hereby deleted and <br />replaced with the following: <br />Pipe shall be measured along the longitudinal axis between the ends as laid and <br />shall include the actual pipe in place. <br />6.10 POLYVINYL CHLORIDE (PVC) SEWER PIPE <br />Installation and construction of PVC sewer main shall conform to all applicable provisions <br />of the ASTM D2321-05 (or later) "Underground Installation of Thermoplastic Pipe for <br />