My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />2. Number, size, material, location and method of installation of suction piping. <br />3. Number, size, material, location and method of installation of discharge piping. <br />4. Bypass pump sizes, capacity, number of each size to be on -site and power <br />requirements. <br />5. Calculations of static lift, friction losses, and flow velocity (pump curves showing <br />pump operating range shall be submitted). <br />6. Standby power generator size. <br />7. Method of protecting discharge manholes or structures from erosion and damage. <br />8. Thrust block sizes and restraining lengths of pipes and locations (if necessary). <br />9. Method of noise control for each pump and/or generator. <br />10. Any temporary pipe supports and anchoring requirements. <br />11. Design plans and computations for access to bypass pumping locations indicated <br />on the drawings. <br />12. Calculations for selection of bypass pumping pipe size. <br />13. Schedule for installation of and maintenance of bypass pumping piping. <br />14. Submit a sewer overflow emergency response plan. The plan will dictate backup <br />pumping plans, spill containment procedures, spill recovery procedures and <br />emergency call out phone numbers. <br />Provision shall be made by the Contractor for the collection of sewage from cutoff lateral <br />sewers. Lateral sewers shall be reconnected to the main before the termination of every <br />working day. <br />The text of Subsection 306-1.6 of the Standard Specifications is hereby deleted and <br />replaced with the following: <br />Pipe shall be measured along the longitudinal axis between the ends as laid and <br />shall include the actual pipe in place. <br />Following placement and compaction of backfill and prior to the placement of permanent <br />pavement, all newly constructed PVC sewer mains shall be cleaned and tested for <br />deflection and ovality by either using: a rigid mandrel for smaller diameter pipe; or laser <br />profile technology and/or with an electronic deflect-o-meter for larger diameter piping. <br />The deflection and or ovality shall not exceed (5%) of the inside diameter of the pipe. If <br />the pipe exceeds this tolerance, it is the responsibility of the contractor to replace and re- <br />test the newly constructed pipe for deflection and ovality. <br />
The URL can be used to link to this page
Your browser does not support the video tag.