My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />reviewed with and approved by the Water Resources Division. The larger manhole cover <br />shall be in accordance with Standard Plan No. 1211 and these Special Provisions. <br />For larger manhole frames and covers, the Water Resources Division may require frames <br />and covers fabricated of fiber reinforced polymer (FRP). These larger FRP manhole frame <br />and cover sets shall be manufactured by GMI Composites, Inc., no equal. <br />The FRP frame and cover system shall meet the following requirements: contain 45 percent <br />to 70 percent fiber reinforcement; thermoset resin with UV inhibitors to prevent photo <br />degredation; minimum strength to weight ratio of 750:1; integrated gasket to minimize <br />traffic shock, abate noise and orders and prevent water entry into manhole; skid slip <br />resistance greater than 0.6 as described in ASTM C 1028 Standard; and dimensional <br />tolerance of 1/16-inch. <br />The FRP frame and cover shall be designed to exceed AASHTO H-20 loading by a factor <br />of 2.5 (125,000 pounds) and shall meet AASHTO EN124 D400 loading (89,924 pound <br />which exceeds AASHTO Proof Load of 50,000 pounds for severe traffic service) proof <br />load on a 250 mm round plate for 30 seconds. Documentation of certified testing results <br />shall be submitted including complete Fatigue Loading Test with no loss of carrying <br />performance and no visible damage (apply 16,000 pound point load for 2,000,000 cycles). <br />The FRP frame and cover shall be provided with a five (5) year guarantee. <br />6.12 REMOVE EXISTING MANHOLE STRUCTURES <br />Removal of existing manholes shall be accomplished in accordance with the project plans, <br />City of Santa Ana Standards and Design Criteria, the applicable provisions of Section 306 <br />of the Standard Specifications, and these Special Provisions. <br />The following is added to the third paragraph of Subsection 306-5 of the Standard <br />Specifications: <br />The top six inches of backfilled subgrade shall be compacted to a relative <br />compaction of 90%. <br />6.13 ABANDON EXISTING SEWER MAIN <br />The Contactor shall abandon existing pipes per Section 306-5 of the Standard <br />Specifications, as specified herein, and as shown on the construction plans. <br />The Contractor shall provide traffic control as required and approved by the agency having <br />jurisdiction. Under no circumstances shall the abandonment take place before existing <br />sewers and manholes are out of service and all flow directed to the new or alternate pipes. <br />The abandon pipes shall be filled with sand cement slurry 1-sack (94lbs) of concrete. In <br />lieu of slurry, the contractor may use low density cellular concrete, Elastizell (EF) or <br />approved equal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.