Laserfiche WebLink
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />The Contractor shall demonstrate that the pipe to be abandoned has been completely filled, <br />without voids, by providing volume calculations for each placement of grout and materials <br />strength tests as required by the City. <br />The Contractor is responsible for the selection methods and material to be used. Pipe <br />abandonment shall be coordinated with the construction sequence. Appropriate plugs shall <br />be installed by the Contractor, and grout shall be injected in an upslope manner to remove <br />trapped air. Samples of the outgoing water (at the exit end) shall be made until the existing <br />grout mix is observed to be similar to the grout being injected at the inlet end. The grouting <br />plan, and grout mix design shall be submitted to the Engineer for review and approval prior <br />to commencement of work. <br />6.14 ABANDON EXISTING MANHOLE STRUCTURES <br />The contractor shall abandon existing manhole structures in conformance to the Standard <br />Specifications Section 306-5, as specified herein, and as shown on the construction plans <br />and per City of Santa Ana Standard Plan No. 1209. <br />The contractor shall provide traffic control as required and approved by the agency having <br />jurisdiction. Under no circumstances shall the abandonment take place before existing <br />sewers and manholes are out of service and all flow directed to the new or alternate pipes. <br />The manhole wall shall be removed to 18-inches below finished surface and be completely <br />removed and properly disposed of, unless otherwise shown. <br />The manhole base shall be perforated or cored through and filled with sand (SE 30 <br />minimum). <br />The manhole rim and cover shall be salvaged and delivered to the City of Santa Ana Water <br />Resources Division at 215 S. Center Street. <br />Existing pipe ends within manholes to be abandoned shall be plugged with concrete and <br />bricks per section 306-5. Concrete shall be Class C and bricks shall be a manhole brick as <br />specified in Section 202-1 of the Standard Specifications. <br />The contractor shall remove and replace all asphalt, concrete pavement, earthwork, <br />landscaping, or other surface damaged by the abandonment operations per an in <br />conformance with these provisions. <br />6.15 CONSTRUCT 4" OR 6" HIGH DENSITY POLYETHYLENE (HDPE) SEWER <br />LATERALS AND CLEANOUTS (PIPE BURST) <br />This work involves the installation of HDPE Pipe. Method of construction shall be via <br />trenchless pipe replacement installations. <br />The Contractor shall connect to the new sewer main and to the existing sewer lateral pipe <br />at the property line. The existing sewer lateral shall be depicted on the construction plans <br />based on the best information available. It is the Contractor's responsibility to "locate <br />