My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />all points of connection for each new sewer lateral at both ends: the wye at the public <br />sewer main and the private connection point at property line where lateral cleanout <br />will be constructed." The Contractor shall insert a push camera with sounder/locator up <br />the lateral from the main (insertion pit) to mark and locate the point of connection at the <br />property line. All locations points shall be marked in the field prior to installation and <br />construction of new sewer lateral. <br />Underground conduit construction shall conform to all applicable Subsections of Section <br />306 and Section 500 of the Standard Specifications, the Standard Plans and these Special <br />Provisions. <br />High density polyethylene pipe in accordance with these specifications shall be used in <br />pipe bursting or trenchless pipe replacement installations. <br />All piping system components shall be the products of one manufacturer and shall conform <br />to the latest edition of ASTM D1248, ASTM D3350, and ASTM F714. <br />The HDPE pipe shall be a minimum of SDR 17 or as specified on the plans. <br />The HDPE pipe shall provide a structurally sound, impermeable, jointless pipe. It shall be <br />the Contractor's responsibility to comply with OSHA Standards and Regulations <br />pertaining to all aspects of the work. <br />The HDPE pipe shall be chemically resistant to internal exposure to sewage containing <br />small quantities of hydrogen sulfide, carbon dioxide, methane, mercaptans, kerosene, <br />moisture and diluted sulfuric acid. It shall also be chemically and physically resistant to <br />external exposure of soil, bacteria, roots and chemical attack due to material in the <br />surrounding ground. <br />The polyethylene resin shall meet or exceed the requirements of ASTM D3350 for PE 3408 <br />material with a cell classification of 345464C, or better. <br />The maximum allowable hoop stress shall be 800 psi at 73.4 degrees F. <br />The Hydrostatic Design Basis (HDB) shall be 1600 psi per ASTM D2837. <br />Material designation shall be PE 3408 following ASTM F412. <br />Pipe shall be assembled in accordance with ASTM D2657 or as otherwise approved by the <br />Engineer. <br />Sanitary sewer pipe shall be green in color or contain green striping. Sanitary sewer pipe <br />interior shall have a reflective coating for CCTV inspection. <br />Contractor shall video laterals prior to pipe bursting in order to identify any features that <br />would disrupt the pipe bursting procedure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.