My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citv : Santa Ana <br />. --- , <br />�VS I ON <br />vcsm <br />.e.✓ <br />�''"-��'� <br />Houston & Harris PCs, Inc. <br />218 Barton <br />Grand Teerr race, CA 92313 <br />Tel: 909-422-8990 <br />Fax:909-422-0841 <br />E-mail: info houstonandharris.com <br />Inspection Report <br />Date <br />P/O. No. <br />Weather <br />Surveyor's Name <br />iWater ID: <br />Section No. <br />1 /31 /2022 <br />Dry <br />M IGU E L <br />1395 <br />148 <br />Certificate No. <br />Survey Customer <br />System Owner <br />Date Cleaned <br />Pre -Cleaning <br />Sewer Category <br />U-1220-70400631 <br />Jetting <br />Street W MC FADDEN AV <br />Use of Sewer <br />Sanitary <br />Upstream MH <br />K08-008 <br />City Santa Ana <br />Drainage Area <br />Dowstream MH <br />K08-009 <br />Loc. details <br />Flow Control <br />Dir. of Survey <br />Downstream <br />Location Code <br />Length surveyed <br />331.55 ft <br />Section Length <br />331.55 ft <br />Purpose of Survey Routine Assessment <br />Joint Length <br />Year Laid <br />Dia./Height <br />12 inch <br />Year Rehabilitated <br />Material <br />Polyvinyl Chloride <br />Tape / Media No. <br />Lining Method <br />Add. Information <br />1:486 Position Code Observation <br />AMH Upstream Manhole, Survey Begins / K08-008 <br />MWL Water Level, 10 %of cross sectional area <br />MWL Water Level, 40 %of cross sectional area <br />MWL Water Level, 20 %of cross sectional area <br />TF Tap Factory Made, at 11 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />TF Tap Factory Made, at 02 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />MGP General Photograph <br />TF Tap Factory Made, at 11 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />TF Tap Factory Made, at 02 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />MWL Water Level, 40 %of cross sectional area <br />TF Tap Factory Made, at 11 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />TF Tap Factory Made, at 02 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />MWL Water Level, 20 %of cross sectional area <br />MWL Water Level, 30 %of cross sectional area <br />MGP General Photograph <br />Grade <br />202.37 FT <br />Task 01-0821 // Page: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.