My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citv : Santa Ana <br />. --- , <br />vcsm . <br />v+ c <br />✓ <br />�'� <br />Houston & Harris PCs, Inc. <br />d. <br />218 Barton Grand Terrace, <br />9race, CA 2313 <br />Tel: 909-422-8990 <br />Fax: 909-422-0841 <br />Email: info houstonandharris.com <br />Inspection Report <br />Date : <br />Job number: <br />Weather : <br />Operator: <br />Counter: <br />Section name <br />1/31/2022 <br />Dry <br />MIGUEL <br />148 <br />Present: <br />Vehicle : <br />Camera : <br />Preset: <br />Cleaned : <br />Rate <br />Jetting <br />1:486 Position <br />Code <br />Observation Rate <br />206.05 <br />TF <br />Tap Factory Made, at 11 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />214.56 <br />TF <br />Tap Factory Made, at 02 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />252.11 <br />TF <br />Tap Factory Made, at 11 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />2 33.01 <br />TF <br />Tap Factory Made, at 02 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />294.65 <br />TF <br />Tap Factory Made, at 11 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />318.38 <br />TF <br />Tap Factory Made, at 02 o'clock, -, within 8 <br />inches of joint: YES, 06" <br />331.55 <br />AMH <br />Downstream Manhole, Survey Ends / K08-009 <br />08-00 <br />QSR <br />QMR <br />SPR <br />MPR <br />OPR <br />SPRI <br />MPRI <br />OPRI <br />0000 <br />0000 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Task 01-0821 // Page: 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.