Laserfiche WebLink
LSA ASSOCIATES, INC. <br />JULY 2010 <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />FIRST STREET BRIDGE REPLACEMENT PROJECT <br />CITY OF SANTA ANA <br />Table 2.1: Responsible Agencies and Other Approving Agencies <br />Agency Permitting Action <br />Caltrans The proposed project will be partially funded by <br /> federal Highway Bridge Replacement and <br /> Rehabilitation (HBRR) funds. HBRR funds are <br /> administered by the Federal Highway <br /> Administration (FHWA), with local oversight <br /> provided by Caltrans. Because the proposed <br /> project is a gap closure project, a Categorical <br /> Exclusion under NEPA is anticipated for NEPA <br /> corn liance. <br />County of Orange Approval of a flood control channel Right of <br /> Entry permit <br />Army Corps of Engineers (ACOE) Section 404 Permits <br /> • Nationwide Permit (NWP) No. 14 for linear <br /> transportation projects with permanent <br /> impacts less than 0.50 ac within the ordinary <br /> high water mark (OHWM) of the Santa Ana <br /> River. <br /> • NWP No. 33 for temporary structures, work, <br /> and discharged necessary for construction <br /> activities <br />California Department of Fish and Game Section 1602 Permit <br /> Streambed Alteration Agreement for the <br /> permanent bridge structure over the channel <br />Santa Ana Regional Water Quality Control Board Section 401 Certification <br /> Certification of NWP Nos. 14 and 33 <br />PADMJ0701\MND\2.0 Project Description.doc (07/25/10) <br />2-25 <br />20A-36