My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract for Traffic Signal Improvements Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025
>
Item 18 - Construction Contract for Traffic Signal Improvements Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 2:03:48 PM
Creation date
10/29/2025 1:29:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
11/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Contract for Traffic Signal Improvement Projects <br />November 4, 2025 <br />Page 4 <br />$1,367,296 (Exhibit 2). As specified in the bid documents, the lowest bid shall be <br />determined on the basis of the Base Bid. Based on available budget and the bid pricing <br />for the additional bid alternatives, Staff recommends awarding a construction contract <br />for the base bid plus additional alternates in the amount of $1,399,284. The bid <br />alternates include installing Emergency Vehicle Preemption (EVP) systems for <br />emergency vehicles like fire trucks and police cars; it works by allowing emergency <br />vehicles to request a green light at an intersection which temporarily overrides the <br />normal traffic signal to create a clear path and improve response times and safety. <br />Based on the bid analysis and a contractor's reference check, staff recommends <br />awarding the construction contract to Elecnor Belco Electric, Inc. (Exhibit 3). <br />Elecnor Belco Electric has previously performed work as a prime contractor in the City <br />of Santa Ana within the past five years, including ARPA Neighborhood Streetlights — <br />Phase 1, ARPA Neighborhood Streetlights — Phase 2, and Traffic Signal Modification at <br />Warner Avenue and Wright Street. The contractor has satisfactorily performed these <br />projects and staff recommends awarding the construction contract to Elecnor Belco <br />Electric, Inc. for the construction of the Project. (Exhibit 3) <br />Proiect Delive <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation for construction administration, <br />inspection, and testing. Construction administration and inspection may be performed <br />by either Staff or consultants and includes construction management, inspection of the <br />Contractor's work to ensure contract compliance, workmanship and quality, materials <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $1,749,105. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$1,399,284 <br />Construction Administration <br />$111,943 <br />Inspection <br />$69,964 <br />Testing <br />$27,986 <br />Unforeseen Conditions <br />$139,928 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$1,749,105 <br />Project Schedule and Contract Time <br />The project completion date is August 2026, barring unforeseeable conditions such as <br />rain, natural disasters, or other delays beyond the control of the City and of the <br />Contractor. The contract time for this project is 120 working days, as specified in the bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.