Laserfiche WebLink
f CITY OF SANTA ANA <br /> 10. Daily work/routes and schedules will be assigned by City Staff. <br /> 11. Contractor shall furnish all labor, equipment tools, and materials and supplies including <br /> Personal Protective Equipment(PPE), such as face mask respirator(N-95), gloves, <br /> coverall suits, trash bags and the skills and training required to perform all services listed <br /> above. <br /> 12. Contractor shall furnish all Signs used for handling traffic control during the course of <br /> this contracts and shall be in accordance with the"Work Area Traffic Control Handbook" <br /> (WATCH), published by Building News, Inc., and made a part of these special <br /> provisions. The method in which signs, barriers, and warning devices are used during <br /> the work shall be in accordance with the publication mentioned. A copy of said <br /> publication is on file in the Public Works Agency. <br /> 2. TRANSIENT AND HOMELESS ENCAMPMENT CLEAN-UP <br /> 1. Contractor shall remove abandoned transient/homeless encampments that may <br /> include, but not be limited to tents,soiled clothing,blankets, human feces, hypodermic <br /> needles, and items listed above. <br /> 2. Contractor shall remove unwanted natural or environmental materials including, <br /> but not limited to, bio-waste, dirt, nests, hypodermic needles, silt, feces, grime <br /> and similar. <br /> 3. Contractor may be assigned to work alongside Local Law Enforcement (Santa <br /> Ana Police Department and California Highway Patrol). <br /> 4. Contractor shall be required to report transient occupied Homeless <br /> Encampments on City and Caltrans properties to Project Manager. <br /> 3. AS-NEEDED WEED AND DEBRIS REMOVAL AND LOT CLEANING — CREW LABORER <br /> 1. Additional as-needed crew laborer services may be requested by the City <br /> and will be compensated at the regular hourly rate as per appropriate bid line <br /> item pricing. <br /> 2. City will issue a work order request for such work to be performed. <br /> 3. These services include, but are not limited to the services listed in Section 1. <br /> il. WORK ORDERS, ASSIGNMENTS, AND SCHEDULE <br /> Work shall be assigned by the City Projects Manager(or Inspector or other City Designated <br /> Person) and shall be on an As-Needed or on a Set Schedule basis, subject to budget <br /> appropriation availability and changes by the Projects Manager. Work hours and staffing may <br /> be increased or decreased based on funding availability. The Projects Manager will work with <br /> the Contractor to prepare the most effective and productive schedules and work <br /> assignments. <br /> Crew Unit Size(s)will vary based on task and assignment and as determined between Projects <br /> Manager and Contractor.Work assignments may vary and may consist of performing weed <br /> City of Santa Ana RFP 25-116 Page 21 of 60 <br />