My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LANDSCAPE WEST MANAGEMENT SERVICES, INC. (12)
Clerk
>
Contracts / Agreements
>
L
>
LANDSCAPE WEST MANAGEMENT SERVICES, INC. (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 8:13:42 AM
Creation date
11/25/2025 1:43:13 PM
Metadata
Fields
Template:
Contracts
Company Name
LANDSCAPE WEST MANAGEMENT SERVICES, INC.
Contract #
A-2025-189
Agency
Public Works
Council Approval Date
11/4/2025
Expiration Date
6/30/2027
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k"t CITY OF SANTA ANA <br /> Note: ONLY when authorized by the City, the use of the City Municipal Corporate <br /> Yard location will be allowed for the disposal of litter and debris generated under this <br /> agreement and will be at no charge to the City. <br /> 3. Amount of debris/rubbish must be documented and required as part of each work <br /> order in order to include the total amount of debris/rubbish collected on monthly <br /> invoicing." <br /> 4. All debris, excess material, and parts, including those materials that could inflict injury <br /> (e.g., nails, wire, wood, etc.), shall be cleaned up continuously as work progresses <br /> and removed at the completion of the job and/or at the end of each work day. <br /> VII. EQUIPMENT <br /> Contractor shall furnish all labor, equipment, materials (including trash bags), tools, <br /> services, and special skills required to perform debris/rubbish and weed abatement removal <br /> services and other related services as set forth in these specifications and in keeping with <br /> the highest standards of quality and performance. Contractor shall ensure that all <br /> equipment, materials, supplies, and consumables meet or exceed all applicable <br /> manufacturer's published specifications and industry standards corresponding to required <br /> work as specified herein. <br /> The Contractor shall perform all work necessary to complete the provisions of this contract <br /> in a satisfactory manner. The Contractor shall furnish all equipment, tools, materials, <br /> supplies, supervision and labor necessary to complete the work. It is mandatory that the <br /> equipment and tools identified below be readily available. <br /> Stake bed — Minimum ten (10) cubic yard stake beds or dump truck with ability <br /> to be loaded by loader and back hoe. <br /> *Required daily., contractor will be responsible to provide <br /> 1. appropriate number of stake bed trucks based on crew size, location <br /> and job assignment. <br /> 2. Lawnmowers—available if needed <br /> 3. Weed eaters <br /> 4. Blowers <br /> 5. Hedge trimmers <br /> 6. Chain saws <br /> 7. Edgers <br /> 8. Shovels <br /> 9. Scoop shovels <br /> 10. Rakes <br /> 11. Loppers <br /> 12. Tree pole saws— available if needed <br /> 13. Hedge shears <br /> 14. Long handled hoes <br /> 15. Pitch forks <br /> 16. Traffic cones or delineators <br /> 17. Wheelbarrows <br /> 18. Push brooms <br /> 19. Pressure Washer - available if needed <br /> City of Santa Ana RFP 25-116 Page 24 of 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.