My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6604 <br />SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />35 <br />8" AWWA C900 PVC Water Main <br />140 <br />LF <br />$ <br />(DR 14), with Appurtenances <br />$510.00 <br />$71,400.00 <br />36 <br />6" Fire Service per C.S.A. Std. 1417, <br />294 <br />LP <br />$ $300.00 <br />$ $58,200.00 <br />with Appurtenances <br />37 <br />4" Gate Valve per C.S.A. Std. 1410 <br />2 <br />EA <br />$ <br />$7,800.00 <br />$15,600.00 <br />38 <br />8" Gate Valve per C.S.A. Std. 1410 <br />1 <br />EA <br />$ <br />$11,000.00 <br />$ <br />$11,000.00 <br />39 <br />Cut, Plug, and Abandon Water Main <br />1 <br />LS <br />$ <br />$27,000.00 <br />$ <br />$27,000.00 <br />and/or Valves per C.S.A. Std. 1409 and <br />1430 <br />_ <br />40 <br />8" PVC Storm Drain and Bedding per <br />594 <br />Li' <br />$ <br />$225.00 <br />$133,650.00 <br />C.S.A. Std. 1150 <br />41 <br />18" RCP and Bedding per C.S.A. Std. <br />206 <br />LF <br />$ <br />$560.00 <br />S $115,360.00 <br />I150 <br />42 <br />24" RCP and Bedding per C.S.A. Std. <br />4 <br />LF <br />S $1,500.00 <br />$ $6,000.00 <br />1150 <br />43 <br />48" RCP and Bedding per C.S.A. Std. <br />46 <br />LF <br />$ <br />$2,000.00 <br />$ <br />$92,000.00 <br />1150 <br />44 <br />63" RCP and Bedding per C.S.A. Std. <br />6 <br />LF <br />$ <br />$3,000.00 <br />$18,000.00 <br />1150 <br />45 <br />Catch Basin Type "C" per C.S,A, Std. <br />1 <br />EA <br />$ <br />$36,000.00 <br />$ <br />$36,000.00 <br />303, W=3.5'with Catch Basin Filter <br />46 <br />Catch Basin Type "C" per C.S.A. Std. <br />1 <br />EA <br />$ <br />$52,000.00 <br />$ <br />$52,000.00 <br />303, W=14', with Catch Basin Filter <br />47 <br />Catch Basin per SPPWC Std. 303, with <br />I <br />EA <br />$ <br />$ <br />$55,000.00 <br />Catch Basin Filter <br />$55,000.00 <br />48 <br />24" x 24" Precast Concrete Drain Inlet <br />3 <br />EA <br />$ <br />$10,000-00 <br />$ <br />$30,000.00 <br />with Atrium Grate and Catch Basin <br />Filter <br />49 <br />Diversion Structure <br />1 <br />FA <br />$ <br />$100,000.00 <br />$ <br />$100,000.00 <br />50 <br />Gate Valve and Vault <br />l <br />EA <br />$ <br />$ <br />$98,000.00 <br />$98,000.00 <br />51 <br />Pretreatment Structure <br />t <br />EA <br />$ <br />5 <br />$225,000.00 <br />$225,000.00 <br />52 <br />Deflective System <br />1 <br />FA <br />$ <br />$ <br />$160,000.0 <br />$160,000.00 <br />53 <br />Subsurface Sedimentation/Storage <br />1 <br />LS <br />$ <br />$ <br />System <br />$515,000.00 <br />$515,000.00 <br />___ <br />54 <br />Drywell <br />12 <br />EA <br />$ <br />$ <br />$55,000.00 <br />$660,000.00 <br />P-3 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.