My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6604 <br />SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />55 <br />Drywell Primary Chamber <br />1 <br />EA <br />$ <br />$ <br />$280,000.00 <br />$280,000.00 <br />56 <br />Junction Structure per SPPWC Sid. <br />1 <br />EA <br />$ <br />$70,000.0 <br />$ $70,000.00 <br />331-3 <br />57 <br />Junction Chamber Type "A" per <br />1 <br />EA <br />$ <br />$ <br />C.S.A. Std. 306 <br />$60,000.00 <br />$60,000.00 <br />58 <br />Manhole per SPPWC Std. 322-3 <br />1 <br />EA <br />$ <br />$ <br />$35,000.00 <br />$35,000.00 <br />59 <br />Tree Removal (As -Needed) * <br />3 <br />EA <br />$ <br />$ <br />$1,500.00 <br />$4,500.00 <br />60 <br />Root Shaving (As -Needed) * <br />15 <br />EA <br />$ <br />$ $900.00 <br />$13,500.00 <br />61 <br />Swing Gate and Posts <br />3 <br />EA <br />$ <br />$ <br />$22,500.00 <br />$7,500.00 <br />62 <br />Rolling Gate and Concrete Pad <br />1 <br />p.S <br />$ <br />$ <br />$75,000.00 <br />$75,000.00 <br />63 <br />Bench <br />3 <br />EA <br />$ <br />$250.00 <br />$ <br />$750.00 <br />64 <br />Zoo Sign <br />1 <br />LS <br />$ <br />$10,200.00 <br />$ <br />$10,200.00 <br />65 <br />Funding Acknowledgement Sign <br />1 <br />EA <br />$3,500 <br />$3,500 <br />66 <br />Interpretive Signs <br />2 <br />EA <br />$ <br />$3,000.00 <br />$ <br />$6,000.00 <br />—__- <br />67 <br />Lighting <br />1 <br />LS <br />$ <br />$ <br />$78,000.00 <br />$78,000.00 <br />68 <br />Electrical Improvements <br />1 <br />LS <br />$ <br />$ <br />$355,000.00 <br />$355,000.00 <br />69 <br />Landscaping and Irrigation <br />1 <br />LS <br />$ <br />$325,000.0 <br />$ <br />$325,000.00 <br />70 <br />Signing and Striping <br />I <br />LS <br />$ $32,000.00 <br />$ $32,000.00 <br />71 <br />Construction Permit <br />l <br />LS <br />$24,200 <br />$24,200 <br />72 <br />90-Day Landscape Establishment <br />l <br />LS <br />$ <br />$17,500.00 <br />$ <br />$17,500.00 <br />73 <br />Construction Information Sign <br />1 <br />EA <br />$ <br />$ <br />$4,000.00 <br />$4,000.00 <br />Bid Alternates <br />74 <br />Flow Meter and Vault <br />1 <br />EA <br />S <br />$ <br />1 <br />$245,000.00 <br />$245,000.00 <br />P-4 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.