My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />California Environmental Quality Act <br />Initial Study/Mitigated Negative Declaration <br />future geotechnical studies, will be implemented during design and construction. Therefore, no <br />adverse impacts are anticipated. <br />e) The Project will not require the installation of septic tanks or alternative wastewater disposal systems, <br />as it does not involve the construction of habitable structures or restroom facilities. Therefore, no <br />impact is anticipated. <br />f) A Paleontological Assessment was conducted by the Western Science Center in October of 2024 and <br />found that the geologic units underlying the project area are mapped as alluvial deposits from the <br />Quaternary period (Pleistocene -Holocene). These Quaternary alluvial units are considered <br />fossiliferous and highly sensitive from a paleontological perspective. While no fossil localities have <br />been identified within the Project area or within a 1-mile radius, the potential for encountering <br />subsurface fossils remains. Since the Project includes earthmoving activities and is expected to <br />extend into the sensitive sediments, mitigation measures PALEO-1 through PALEO-3 will be <br />incorporated into reduced impacts to less than significant. <br />-22CWE7 <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.