My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Mitigation Measures: <br />California Environmental Quality Act <br />Initial Study/Mitigated Negative Declaration <br />PALED-1 — A paleontologist who meets the qualifications of established by the Society of Vertebrate <br />Paleontology (SVP) shall be retained to develop a Paleontological Resources Impact Mitigation Program <br />(PRIMP) for this Project. The PRIMP shall be consistent with the standards of the SVP and include the <br />methods that will be used to protect paleontological resources that may exist within the Project area, as <br />well as procedures for monitoring, fossil preparation and identification, curation into a repository, and <br />preparation of a report at the conclusion of grading. <br />PALEO-2 — Excavation and grading activities in deposits with high paleontological sensitivity (i.e., <br />Santiago Formation) shall be monitored by a qualified paleontological monitor following a PRIMP. No <br />monitoring is required for excavations in deposits with no paleontological sensitivity (i.e., Alluvial Flood <br />Plain Deposits and Artificial Fill). If paleontological resources are encountered during the course of <br />ground disturbance, the paleontological monitor shall have the authority to temporarily redirect <br />construction away from the area of the find. In the event that paleontological resources are encountered <br />when a paleontological monitor is not present, work in the immediate area of the find shall be redirected, <br />and the paleontologist or paleontological monitor shall be contacted to assess the find for scientific <br />significance. If determined to be scientifically significant, the fossil shall be collected from the field. <br />PALEO-3 — Collected resources shall be prepared to the point of identification, identified to the lowest <br />taxonomic level possible, cataloged, and curated into the permanent collections of a museum repository. <br />At the conclusion of the monitoring program, a report of findings shall be prepared to document the <br />results of the monitoring program. <br />-23CWE7 <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.