6 of 18 <br />shall make every effort necessary to avoid any delays on each of the project schedules. <br />Consultants shall notify the City Engineer as soon as any potential delay on any portion of <br />contract work is known or identified. Consultants shall work together in a good faith effort to <br />ensure projects are delivered in an efficient, effective, safe, and timely manner. <br />13. Final Plan Report: Final report shall include but not be limited to the following: <br />i. Introduction <br />ii. Relationship of this document to existing documents <br />iii. Collision analysis <br />iv. Toolbox of potential street improvements <br />v. Recommended improvements <br />vi. Cost estimates <br />vii. Prioritization <br />viii. Matrix of proposed countermeasures <br />ix. Appendices (include all relevant data) <br />SUMMARY OF PRODUCTS <br />The required products, which are to be delivered to the Traffic Engineering section of the City of Santa <br />Ana Public Works Agency, shall be as follows: <br /> <br />• All data collection information for each street segment/intersection. <br />• The draft Safe Routes to Parks and Wheelchair Assessment Plan report. (electronic) <br />• The final Safe Routes to Parks and Wheelchair Assessment Plan report. (10 hard copies, one <br />electronic) <br /> <br />All written reports, information, data, charts, tables, maps, drawings, etc. in electronic format acceptable <br />to the City of Santa Ana. <br /> <br />3.2 Project’s Estimated Schedule. <br /> <br />Supplemental Planning Schedule <br /> <br />Milestone Schedule Date <br />Planned NEPA Completion Date: October 7, 2024 <br />Planned Draft Plan Completion Date: June 30, 2028 <br />Planned Final Plan Completion Date: July 31, 2028 <br />Planned Final Plan Adoption Date: August 31, 2028 <br />Planned SS4A Final Report Date: September 30, 2028 <br /> <br />3.3 Project’s Estimated Costs. <br /> (a) Eligible Project Costs