Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 25-6033 <br />TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND <br />SEGERSTROM AVENUE & FLOWER STREET <br />PROJECT NO.: 22-6018 <br />PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND <br />TOWNER STREET <br />Item <br />Description <br />Qty^ <br />Unit <br />Unit Price <br />Amount <br />11 <br />IP Communication System <br />I <br />LS <br />$ <br />$ <br />34,300 <br />3N,300 <br />12 <br />* Install 12 Strand SMFO Cable <br />350 <br />LF <br />$ <br />$ <br />3 <br />I,oSo <br />13 <br />* Install 144 Strand SMFO <br />4075 <br />LF <br />$ <br />$20 <br />Cablegn5 <br />15 <br />14 <br />* Fusion Splice Strands of <br />144 <br />EA <br />$ <br />44 <br />$ <br />SMFO_ <br />Gz3c. <br />15 <br />Fiber Optic Splice Enclosure <br />_ <br />3 <br />EA <br />$ <br />$ <br />1 128 <br />16 <br />Signing and Striping <br />1 <br />LS <br />$ <br />$i,n g(.o <br />17 <br />* Pothole Pole Locations for <br />16 <br />EA <br />$ <br />$ <br />Utility Conflicts <br />18,980 <br />18 <br />Temporary Overhead Wiring <br />1 <br />LS <br />$ <br />$ <br />22,lbf0 <br />22,1oc, <br />19 <br />PCC Sidewalk (T=4") <br />250 <br />SF <br />$ <br />cbo <br />$ 5100 <br />2 2 <br />20 <br />PCC Curb Ramp <br />250 <br />SF <br />$1% qo <br />$14 <br />22S <br />21 <br />CCTV Inspection of Existing <br />1 <br />LS <br />$ <br />$ <br />Sewer Main and Laterals (Pre <br />ld o00 <br />lQ QCC) <br />and Post Construction) <br />22 <br />Project Advertising Sign(s) <br />3 <br />EA <br />$ <br />$ <br />1,loo <br />3p <br />23 <br />Construction Permit <br />1 <br />LS <br />$ 8,000 <br />12W113V <br />