My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELECNOR BELCO ELECTRIC, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ELECNOR BELCO ELECTRIC, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2025 4:19:19 PM
Creation date
12/3/2025 4:16:49 PM
Metadata
Fields
Template:
Contracts
Company Name
ELECNOR BELCO ELECTRIC, INC.
Contract #
25-6033, 22-6018
Agency
Public Works
Council Approval Date
11/4/2025
Expiration Date
1/1/1900
Insurance Exp Date
11/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAI. <br />PROJECT NO.: 25-6033 <br />TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND <br />SEGERSTROM AVENUE & FLOWER STREET <br />PROJECT NO.: 22-60I S <br />PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND <br />TOWNER STREET <br />TOTAL BASE BID- ITEMS 1-23 ,3(o-7, 2stG .OQ <br />ADD ALTERNATE BID <br />24 <br />Install GTT Opticom EVP System at <br />I <br />LS <br />S <br />$ <br />Segerstrom Avenue and Raitt Street <br />25 <br />install GTT Opticom EVP System at <br />I <br />LS <br />S <br />$ <br />Segerstrom Avenue and Flower Street <br />TOTAL ALTERNATE BID —ITEMS 24-25 � fit, 99$ <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LI UIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within One Hundred Twenty (120) working days after the commencement date stated in <br />the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place <br />order for long -lead time items (i.e. Traffic Signal Poles, Electrical Meter Pedestal and Fiber Optic <br />Cable). The absolute maximum time of completion of improvement (including time extensions, <br />weather, and material procurement) shall not exceed 365 calendar days. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $4,200 per calendar day. <br />Name of Firm Elecnor Belco Electric, Inc. <br />Signature of BIDDER t=sl,John Wong <br />Title Executive Vice Prc; <br />(If an individual, so state. IALOH' -Kr co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-3 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.