My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026 Regular
>
Agenda Packet_2026-02-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 8:51:31 AM
Creation date
1/28/2026 8:46:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K2 Traffic Engineering, Inc. <br /> Intersection Capacity Utilization Analysis (ICU) <br /> Traffic Scenario: Existing + Project <br /> Intersection # 1 <br /> Project: Saigon Reformed Church <br /> North/South St: Euclid St Date: 3/5/25 <br /> East/West St: McFadden Ave By: KH <br /> A.M. Peak Hour P.M. Peak Hour <br /> No, Critical Volumes Volumes <br /> Movement of Lane Critical V/C Critical Critical V/C Critical <br /> Lanes Capacity Total Lane Ratio V/C Total Lane Ratio V/C <br /> :Left 1.0 1600 126 126 0.079 0.079 155 155 0.097 <br /> Northbound :Thru 2.0 1700 961 524 0.308 1438 758 0.446 0.446 <br /> Right: 1600 87 77 <br /> :Left 1.0 1600 121 121 0.076 137 137 0.086 0.086 <br /> Southbound :Thru 3.0 1700 1884 694 0.408 0.408 1093 424 0.249 <br /> Right: 1600 197 179 <br /> :Left 1.0 1600 145 145 0.091 171 171 0.107 <br /> Eastbound :Thru 2.0 1700 367 300 0.176 0.176 393 296 0.174 0.174 <br /> Right: 1600 232 199 <br /> :Left 1.0 1600 127 127 0.079 0.079 104 104 0.065 0.065 <br /> Westbound :Thru 2.0 1700 405 267 0.157 5 86 0.051 <br /> Right: 1600 128 167 <br /> Sum of Critical V/C Ratios 0.742 0.771 <br /> Adjustments for Lost Time 0.050 0.050 <br /> Intersection Capacity Utilization (ICU) 0.792 0.821 <br /> Level of Service (LOS) C D <br /> NOTES: Level of Service (LOS) Critical Lane Flow Factors <br /> A 0.00 - 0.60 0.5 Lanes: 2.00 <br /> 8 0.61 - 0.70 1 Lane: 1.00 <br /> C 0.71 - 0.80 1.5 Lanes: 0.67 <br /> D 0.81 - 0.90 2 Lanes: 0.50 <br /> E 0.91 - 1.00 2.5 Lanes: 0.40 <br /> F 1.00+ 3 Lanes: 0.33 <br /> City Council 18 - 113 2/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.