Laserfiche WebLink
Mano Dishoian <br />November 8, 2022 <br />Page 2 <br /> <br />N:\4600\2224606 - Forty Martyrs Armenian Church - Middle School Project, Santa Ana\Report\4606 FMA Church - Middle School Project 11-8-2022.docx <br />which is located on the eastern property line, is also provided. It should be noted that <br />the eastern driveway is gated and was observed to be closed and not used as an “exit” <br />for site traffic. A separate driveway, located directly to the east of the Project’s “exit <br />only” driveway provides access to the Armenian Center. Figure 1, located at the rear <br />of this letter report, presents a Vicinity Map, which illustrates the general location of <br />the Project site in the context of the surrounding street system. Figure 2 presents the <br />existing aerial and illustrates the existing buildings and parking areas. <br />Forty Martyrs Armenian School <br />The FMA School currently has an enrollment of 149 students in Transitional <br />Kindergarten (TK)/Kindergarten (K) through Grade 6, and employs 24 faculty, <br />administrative staff, and support staff. The existing school consists of a 10,120 square <br />feet (SF) building. Classes start at 8:00 AM and end at 3:30 PM. After-school activities <br />include Academic Chess, Athletics, and other after school enrichment programs. <br />Special events during the academic year include: <br />• Kindergarten Orientation <br />• Back to School <br />• Parent-Teacher Conference <br />• School Open House <br />• End of Year Graduation Ceremony for Kindergarten and 6th Graders <br /> <br />The Project is proposing to increase the FMA School from 4 classrooms to 5 <br />classrooms which will increase the school by 4,960 SF for a total building size of <br />15,080 SF to provide additional spaces for the current K-6 elementary school and <br />accommodate the proposed middle school; the anticipated number of added students is <br />not known at this time. The parking lot layout is proposed to be modified to increase <br />the existing supply from 50 spaces to 88 spaces. Figure 3 presents the proposed site <br />plan. <br /> <br />Forty Martyrs Armenian Church <br />The FMA Church currently has 30 pews which can accommodate up to 7 adults on <br />each pew for a total seating capacity of 210 seats. As part of the Project, the church <br />does not have any plans to increase seating capacity or building size. As such, no <br />changes are proposed to the existing church component. The existing church currently <br />has service every Sunday from 10:30 AM and ends at 12:30 PM. <br /> <br />