Laserfiche WebLink
Exhibit A-2 <br /> Requirements:System Control <br /> ,Project Name:Centennial Park Playground I Project 4:245379 <br /> Control System I0:1 of 1 <br /> Project Information Distribution Panel Location/ID:Service 1 <br /> Control System roject Notes: <br /> Control System Id: ..1� <br /> Control System Type, Control-Link Ci trol and MAlpring <br /> R system <br /> Communication Type: g � AV <br /> erLine-5T <br /> Power RequireEquipment Listing <br /> Control cabinet(s): ° <br /> Control valtag �� hie to neutl� 120/60 '® <br /> VA loading-Inru h 0 1308,0 Control and monitoring cabinet- 1 24 X 48 <br /> VA loading-Sealed Z 154.0 primary <br /> Lighting Circuits- '�,� <br /> Contactors,30 amperes 3 <br /> Voltage/Hertz/PhRP 480/60/3 <br /> Off/On/Auto switches 2 <br /> '05,11114 <br /> lrktport 1�Notes: <br /> 1. Please confirm that the lighting circuit voltage listed above is accurate for this facility.This is the voltage/phase being <br /> connected and utilized at each lighting pole's electrical components enclosure disconnect.Inaccurate voltage/phase can <br /> result in additional costs and delays.Contact your Musco sales representative to confirm this item, <br /> 2. In a 3 phase design,all 3 phases are to be run to each pole location.Musco's single phase luminaires come pre-wired to utilize <br /> all 3 phases across the entire facility. <br /> 3. One contactor Is required for each circuit at each pole location.Contactors are 3 pole and 100%rated for the published <br /> continuous load. <br /> 4, if the lighting system will be fed from more than one distribution location,additional equipment may be required,Contact <br /> Your Musco sales representative, <br /> 5. Size overcurrent devices using the full load amps column of the Circuit Summary by Switch chart(Minimum power factor is <br /> 0.9).Size conduit per code unless otherwise specified as larger to allow for harness connectors. <br /> 6. Avoid use of in-ground junction/pull boxes when possible.If used,the following best practices must be followed; <br /> Underground handholes(pull boxes)must be supported to prevent settling.Boxes buried directly in soil,without support, <br /> are not allowed. <br /> •Use polymer concrete lids marked with ELECTRIC for underground handholes.Steel lids are not allowed. <br /> Avoid underground connections when possible.If used,all wire connectors must be UL listed for Wet Locations to prevent <br /> leakage current. <br /> 7. Control power wiring must be In separate conduit from fine or load power wiring.Communication cables must be in separate <br /> conduit from any power wiring. <br /> 8. Test wire per ANSI/NETA ATS-2021,Wires with Insulation resistance less than 100 MOhms,in water-filled conduit,must be <br /> replaced. <br /> 9. Refer to Installation Instructions for more details on equipment Information and the Installation requirements. <br /> sales Representative:Mike Marchetti I Project Engineer:Daniel Lohman I Scan:245379A I Document I1):245379P1 V1 C2-0526143701 <br /> l�l�C®, <br /> r , <br /> Page 1 of3--=ay-2025 <br />