Laserfiche WebLink
System Requirements: Control System Summary <br /> Project Namer Centennfal Park Playground I Project M 245379 <br /> Control System tt):1 of 1 <br /> Equipment Layout and Connection Details n1stribution Panel Location/0 Service I <br /> ff. 1) Lighting system <br /> I � <br /> Control cabinet location(s) j <br /> . I I <br /> VYWW + <br /> j i it�l iJ' <br /> 17?j i <br /> J <br /> I,1b}_.5 � ... <br /> i <br /> DetailsConnection <br /> Equipment <br /> Description <br /> Description <br /> la Line power to contactors,and equipment grounding conductor.Requires one 1 Control and monitoring cabinet- <br /> circuit per contactor,size wiring per load and voltage drop, primary <br /> 1 b Load power from contactors,and equipment grounding conductor.Requires <br /> one circuit percontactor,size wiring per load and voltage drop. <br /> 2a Control power with equipment ground to control cabinet.Requires dedicated <br /> 20 A circuit,Provide transformer if control voltage not present, <br /> Sales representative:Mike Marchetti j Project Engineer:Daniel Lohman J Scan:245379A I Docurnent ID:245379p1 V1 C2.0526143701 <br /> Page 2 of 3--26-May-2025 • ' <br />