Laserfiche WebLink
<br />Project P Regional Traffic Signal Synchronization Program <br />Table of Contents <br />Project P Supplemental Application Checklist Page <br />RTSSP Online Application – submitted through OCFundTracker <br />a. Transportation Significance <br />b. Economic Effectiveness <br />c. Project Characteristics Onlined. Project Scale <br />e. Number of Jurisdictions <br />f. Current Project Status <br />g. Funding Match <br />h. Cabinet photos, equipment specifications, as-built drawings, cabinet drawings, etc. <br />Section 1: Key Technical Information <br />a. Name of Project Corridor/Grid/Route <br />b. Project Limits <br />Online only <br />1 <br />1 <br />1c. Project Length <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />3 <br />d. Number of Signalized Intersections Along Corridor <br />e. Participating Agencies/Traffic Forum Members <br />f. Lead Agency <br />g. Designation of the corridor to synchronize <br />h. Project Start and End Date <br />i. Previous funding <br />j. Contact Information <br />k. Signalized intersections that are part of the project <br />l. Offset signalized intersections that are part of the project <br />m. Project Map Depicting the Project Limits <br />Section 2: Regional Significance <br />Section 3: Acknowledgement of Required Tasks <br />Section 4: Funding Needs/Costs for Proposed Project by Task <br />a. Summary of Project Cost <br />4 <br />5-8 <br />9 <br />b. Summary of Cost by Agency 10-11 <br />12-13 <br />14 <br />c. Summary of Intersection Improvement Costs <br />Section 5: Detailed Local Match Commitment <br />Section 6: Project Schedule by Task <br />a. Project Start and End Dates 15 <br />15b. Project Schedule by Task <br />Appendices <br />A. Calculations and Estimated Points <br />B. Agency Improvement Calculations <br />C. Vehicle Miles Traveled (VMT) <br />D. Agency Resolutions and Letters of Support <br />E. Cabinet Photos and As-built drawings (Uploaded to OCFundTracker and included in Electronic <br />Submittal Only) <br />i <br />  <br />  <br />City Council 18 – 5 4/1/2025