My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-04-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025 Regular
>
Agenda Packet_2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 4:19:43 PM
Creation date
2/18/2026 4:14:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/1/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project P Regional Traffic Signal Synchronization Program <br />Table of Contents <br />Project P Supplemental Application Checklist Page <br />RTSSP Online Application – submitted through OCFundTracker <br />a. Transportation Significance <br />b. Economic Effectiveness <br />c. Project Characteristics Onlined. Project Scale <br />e. Number of Jurisdictions <br />f. Current Project Status <br />g. Funding Match <br />h. Cabinet photos, equipment specifications, as-built drawings, cabinet drawings, etc. <br />Section 1: Key Technical Information <br />a. Name of Project Corridor/Grid/Route <br />b. Project Limits <br />Online only <br />1 <br />1 <br />1c. Project Length <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />3 <br />d. Number of Signalized Intersections Along Corridor <br />e. Participating Agencies/Traffic Forum Members <br />f. Lead Agency <br />g. Designation of the corridor to synchronize <br />h. Project Start and End Date <br />i. Previous funding <br />j. Contact Information <br />k. Signalized intersections that are part of the project <br />l. Offset signalized intersections that are part of the project <br />m. Project Map Depicting the Project Limits <br />Section 2: Regional Significance <br />Section 3: Acknowledgement of Required Tasks <br />Section 4: Funding Needs/Costs for Proposed Project by Task <br />a. Summary of Project Cost <br />4 <br />5-8 <br />9 <br />b. Summary of Cost by Agency 10-11 <br />12-13 <br />14 <br />c. Summary of Intersection Improvement Costs <br />Section 5: Detailed Local Match Commitment <br />Section 6: Project Schedule by Task <br />a. Project Start and End Dates 15 <br />15b. Project Schedule by Task <br />Appendices <br />A. Calculations and Estimated Points <br />B. Agency Improvement Calculations <br />C. Vehicle Miles Traveled (VMT) <br />D. Agency Resolutions and Letters of Support <br />E. Cabinet Photos and As-built drawings (Uploaded to OCFundTracker and included in Electronic <br />Submittal Only) <br />i <br /> <br /> <br />City Council 18 – 5 4/1/2025
The URL can be used to link to this page
Your browser does not support the video tag.