My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-04-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025 Regular
>
Agenda Packet_2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 4:19:43 PM
Creation date
2/18/2026 4:14:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/1/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 1: KEY TECHNICAL INFORMATION <br />a. Project Corridor <br />Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP <br />Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor <br />b. Project Limits: <br />from Lambert Road to Dyer Road <br />c. Project Length (miles ): <br />15.14 <br />d. Number of signalized intersections along the corridor (include all Caltrans intersections): <br />61 number of offset signals included in this projectnumber of signals on project corridor(s)3 <br />e. Participating agencies / Traffic Forum Members (including applicant agency ):San Juan Capistrano <br />Santa Ana <br />Seal Beach <br />Stanton <br />Aliso Viejo <br />Anaheim <br />Cypress La Habra <br />La Palma <br />Los Alamitos <br />Mission Viejo <br />Newport Beach <br />Dana Point <br />Fountain Valley <br />Fullerton <br />Brea <br />Buena Park <br />Caltrans <br />Laguna Beach <br />Laguna Hills <br />Laguna Niguel <br />Laguna Woods <br />Lake Forest <br />Orange Tustin <br />Villa Park <br />Westminster <br />Yorba Linda <br />Garden Grove <br />Huntington Beach <br />Irvine <br />Placentia <br />Rancho Santa Margarita <br />San Clemente <br />Costa Mesa <br />County of Orange <br />f. Lead Agency <br />Santa Ana <br />g. Designation of the corridor to synchronize: <br />Signal Synchronization Network Corridor / Priority Corridor Master Plan of Arterial Highways Corridor <br />h. Project Start Date: <br />i. Select any that apply: <br />January 1, 2025 Project End Date:December 31, 2027 <br />Re-timing at least 75% of previous project Timing at least 75% of new eligible project None <br />All participating agencies are participating in the Countywide Baseline Project <br />j. Contact Information (Include name, title, agency, phone, email, and address) <br />Cesar Rodriguez, Senior Civil Engineer <br />City of Santa Ana, 714-647-5626 <br />crodriguez5@santa-ana.org <br />20 Civic Center Plaza <br />Albert Espinoza, City Engineer <br />City of Brea, 714-990-7657 <br />alberte@ci.brea.ca.us <br />1 Civic Center Circle <br />Brea, CA 92821Santa Ana, CA 92701 <br />Kyra Tao, Transportation Manager <br />City of Placentia, 714-993-8121 <br />ktao@placentia.org <br />John Thai, Principal Traffic Engineer <br />City of Anaheim, 714-765-5294 <br />jthai@anaheim.net <br />401 E. Chapman Ave. <br />Placentia, CA 92870 <br />200 S. Anaheim Blvd, Suite 276 <br />Anaheim, CA 92805 <br />Gabrielle Hayes, Senior Civil Engineer <br />City of Orange, 714-744-5561 <br />ghayes@cityoforange.org <br />300 E. Chapman Avenue <br />Orange, CA 92866 <br />Pauline Nguyen, Branch Chief, Traffic Signals/Ramp <br />Metering/ <br />Census Caltrans District 12, 949-279-9168 <br />6681 Marine Way <br />Irvine, CA 92618 <br />1 <br /> <br /> <br />City Council 18 – 6 4/1/2025
The URL can be used to link to this page
Your browser does not support the video tag.