CITY OF SANTA ANA <br /> ground protection as needed to minimize damage to existing grounds. <br /> Repair damage to grounds which exceeds that which would be <br /> expected. Indentations caused by heavy equipment traveling over dry <br /> ground would be an example of expected damage. Ruts and sod <br /> damage caused by equipment traveling over wet grounds would be an <br /> example of damage requiring repair. <br /> xi. Provide startup and aiming as required to provide complete and <br /> operating exterior atheletic lighting lighting system. <br /> xii. Installation to commence upon delivery and proceed without <br /> interruption until complete. Notify Contractor immediately of any breaks <br /> in schedule or delays. <br /> xiii. Shall sod trenches to match existing conditions. <br /> b) Foundations, Poles, and Luminaires: <br /> i. Mark and confirm pole locations per the aiming diagram provided. If <br /> there are any issues, immediately notify your Project Manager. <br /> ii. Provide labor, materials, and equipment to install foundations as <br /> specified on Layout and per the stamped foundation drawings. <br /> iii. Remove spoils from site and deposited at City yard. <br /> iv. Provide labor, materials, and equipment to assemble (3) Musco TLC- <br /> LED or equivalent luminaires, electrical component enclosures, poles, <br /> and pole harnesses. <br /> V. Provide labor, equipment, and materials to erect (1) dressed LSS <br /> Poles and aim utilizing the pole alignment beam.Bris <br /> c) Electrical: <br /> i. Provide labor, materials, and equipment to install new breakers as <br /> needed in existing panel MP (240v11 Ph). <br /> ii. Provide labor, materials, and equipment to intercept City-installed <br /> conduits from panel MP and install all underground conduit, wiring, pull <br /> boxes etc. and terminate wiring as required for the exterior atheletic <br /> lighting and site lighting. <br /> iii. Provide as-built drawings on completion of installation, <br /> d) Control System: <br /> i. Provide NEMA 3R painted steel cabinet to house new lighting controls. <br /> Provide labor, equipment, and materials to install new 3R cabinet on <br /> extended concrete pad adjacent to panel MP, Panel MP and extended <br /> pad provided by City. <br /> ii. Provide labor, equipment, and materials to install control and <br /> monitoring cabinet(s) and terminate all necessary wiring, <br /> iii. Provide a dedicated 120 V 20 A controls circuit or a step-down <br /> transformer for 120 V control circuit if not available. <br /> iv. Check all zones to make sure they work in both auto and manual <br /> mode. <br /> V. Commission Control-Link® by contacting Control-Link CentralTM <br />