My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Agreements for Improvements to the Railroad Crossing on Warner and McFadden
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 15 - Agreements for Improvements to the Railroad Crossing on Warner and McFadden
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:30:28 AM
Creation date
4/15/2026 9:25:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />connection with the Project up to the date of termination, including, without limitation, all <br />actual costs incurred by the Railroad in connection with reviewing any preliminary or final <br />Project Plans. <br />Section 11. CONDITIONS TO BE MET BEFORE <br />POLITICAL BODY CAN COMMENCE WORK <br />Neither the Political Body nor the Contractor may commence any work within the <br />Crossing Area or on any other Railroad property until: <br />(i) The Railroad and Political Body have executed this Agreement. <br />(ii) The Railroad has provided to the Political Body the Railroad's written <br />approval of the Plans. <br />(iii) Each Contractor has executed Railroad's Contractor's Right of Entry <br />Agreement and has obtained and/or provided to the Railroad the insurance <br />policies, certificates, binders, and/or endorsements required under the <br />Contractor's Right of Entry Agreement. <br />(iv) Each Contractor has given the advance notice(s) required under the <br />Contractor's Right of Entry Agreement to the Railroad Representative <br />named in the Contactor's Right of Entry Agreement. <br />Section 12. FUTURE PROJECTS <br />Future projects involving substantial maintenance, repair, reconstruction, renewal <br />and/or demolition of the Roadway shall not commence until Railroad and Political Body <br />agree on the plans for such future projects, cost allocations, right of entry terms and <br />conditions and temporary construction rights, terms and conditions. <br />Section 13. ASSIGNMENT: SUCCESSORS AND ASSIGNS <br />A. Political Body shall not assign this Agreement without the prior written <br />consent of Railroad. <br />B. Subject to the provisions of Paragraph A above, this Agreement shall inure <br />to the benefit of and be binding upon the successors and assigns of Railroad and Political <br />Body. <br />Section 14. SPECIAL PROVISIONS PERTAINING TO AMERICAN <br />RECOVERY AND REINVESTMENT ACT OF 2009 <br />If the Political Body will be receiving American Recovery and Reinvestment Act <br />("ARRA") funding for the Project, the Political Body agrees that it is responsible in <br />performing and completing all ARRA reporting documents for the Project. The Political <br />
The URL can be used to link to this page
Your browser does not support the video tag.