Laserfiche WebLink
Material And Force Account Estimate <br />Santa Ana <br />Estimate Number: 146748 Version: 2 <br />Standard Rates: Labor Additive = 252% <br />Estimate Good Until 09/04/26 <br />Location: SANTA ANA IND LD, INDL, 517.98-518.02 <br />Description of Work: 761245R Mc Fadden Ave Santa Ana CA 518 Santa Ana Ind Ld <br />Prepared For: Santa Ana <br />Buy America: Yes <br />COMMENTS FACILITY Description QTY <br />UOM UCST <br />LABOR <br />MATERIAL <br />TOTAL <br />UP %0 <br />Agcy %100 <br />ENGINEERING <br />Engineering <br />1 <br />LS <br />45,140.00 <br />45,140 <br />0 <br />45,140 <br />0 <br />45,140 <br />Bill Prep Fee - Track Surface RECOLLECT <br />1 <br />LS <br />900.00 <br />0 <br />900 <br />900 <br />0 <br />900 <br />Homeline Freight - Track Surface RECOLLECT <br />1 <br />LS <br />900.00 <br />0 <br />900 <br />900 <br />0 <br />900 <br />Foreign Line Freight - Track Surface RECOLLECT <br />1 <br />LS <br />1,662.82 <br />0 <br />1,663 <br />1,663 <br />0 <br />1,663 <br />Sub -Total = <br />45,140 <br />3,463 <br />48,603 <br />0 <br />48,603 <br />TRACK CONSTRUCTION - COMPANY <br />Mobilization: Company <br />1 <br />DA <br />11,450.00 <br />11,450 <br />0 <br />11,450 <br />0 <br />11,450 <br />RDXING <br />RDXING 136# CON10W PP PAN COMPLETE <br />88 <br />TF <br />1,040.08 <br />51,047 <br />40,480 <br />91,527 <br />0 <br />91,527 <br />TRACK <br />136# CWRISO 24-8'6" PPHWD N 16 TP <br />32 <br />TF <br />1,032.57 <br />24,995 <br />8,047 <br />33,042 <br />01 <br />33,042 <br />COMPJT <br />Transition Rail - 136# <br />2 <br />PR <br />7,985.41 <br />8,767 <br />7,204 <br />15,971 <br />0 <br />15,971 <br />Sub -Total = <br />96,260 <br />55,731 <br />151,990 <br />0 <br />151,990 <br />TRACK REMOVAL - COMPANY <br />RDXING <br />Remove road crossing - concrete <br />188 <br />1 TF <br />108.791 <br />9,574 <br />0 <br />9,574 <br />01 <br />9,574 <br />TRACK <br />Remove Track <br />132 <br />1 TF <br />1 42.251 <br />1,3521 <br />01 <br />1,3521 <br />01 <br />1,352 <br />Sub -Total = <br />10,925 <br />0 <br />10,925 <br />0 <br />10,925 <br />EQUIPMENT RENTAL <br />Equipment Rental 1 1 <br />1 LS 1 25,000.001 <br />01 <br />25,0001 <br />25,0001 <br />01 <br />25,000 <br />Sub -Total = <br />0 <br />25,000 <br />25,000 <br />0 <br />25,000 <br />Total Wgt. in Tons = 594 <br />Totals = <br />152,325 <br />84,193 <br />236,518 <br />0 <br />236,518 <br />Grand Total = <br />$236,518 <br />Please Note: The above figures are estimates only and are subject to fluctuation. In the event of an <br />increase or decrease in the cost or amount of material or labor required, Santa Ana will <br />pay actual <br />construction costs at the current rates effective thereof. <br />Thursday, September 4, 2025 Page 1 of 1 <br />