Laserfiche WebLink
Material And Force Account Estimate <br />City of Santa Ana EXHIBIT 4 <br />Estimate Creation Date: 3/12/2024 Number: 147796 Version: 1 <br />Estimate Good Until 09/08/26 <br />Location: SANTA ANA IND LD, INDL, 517.19-522.84 <br />Buy America: Yes <br />Description of Work: Santa Ana Ind Lead Santa Ana, CA McFadden Ave DOT#761245R WO#72190 PID#131124 <br />100% Recollectable <br />COMMENTS Description QTY UOM Unit LABOR MATERIAL TOTAL <br />Cost <br />SIGNAL <br />Gang Day - 5 Man <br />2 <br />EA <br />7,500.00 <br />15,000 <br />0 <br />15,000 <br />Xing -1 Trk CWE w/Gates <br />1 <br />EA <br />131,584.00 <br />41,200 <br />90,384 <br />131,584 <br />Xing - Flasher/Ped (pair) <br />1 <br />LS <br />57,560.00 <br />16,000 <br />41,560 <br />57,560 <br />Xing - Install Web and Head <br />Bonds per 1000 TF <br />2 <br />EA <br />1,865.00 <br />3,200 <br />530 <br />3,730 <br />Public Project Mgmt. <br />Xing - Misc. <br />1 <br />LS <br />10,000.00 <br />0 <br />10,000 <br />10,000 <br />Xing - Remove Location <br />(Gates/Cants) <br />1 <br />LS <br />4,000.00 <br />4,000 <br />0 <br />4,000 <br />Xing - Sidelight <br />1 <br />EA <br />907.00 <br />0 <br />907 <br />907 <br />Security Fence <br />Xing - Misc. <br />1 <br />LS <br />10,000.00 <br />0 <br />10,000 <br />10,000 <br />10 % Labor Contingency <br />Xing - Misc. <br />1 <br />LS <br />28,924.00 <br />28,924 <br />0 <br />28,924 <br />Xing - Engineering Design <br />1 <br />LS <br />8,550.00 <br />8,550 <br />0 <br />8,550 <br />Xing - Boring <br />1 <br />LS <br />50,000.00 <br />0 <br />50,0001 <br />50,000 <br />Xing - Fill/Rock/Gravel <br />1 <br />LS <br />3,800.00 <br />0 <br />3,8001 <br />3,800 <br />FED W/INDR & OVRHD 228.86% <br />Xing - Labor Additive <br />1 <br />LS <br />201,285.00 <br />201,285 <br />01 <br />201,285 <br />Xing - Meter Service <br />1 <br />LS <br />15,000.00 <br />0 <br />15,0001 <br />15,000 <br />Sub -Total = 318,159 222,181 540,340 <br />Totals = 318,159 222,181 540,340 <br />Grand Total = $540,340 <br />Please Note: The above figures are estimates only and are subject to fluctuation. In the event of an <br />increase or decrease in the cost or amount of material or labor required, City of Santa Ana will pay <br />actual construction costs at the current rates effective thereof. <br />Monday, September 22, 2025 Page 1 of 1 <br />