My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA PRECISION CONCRETE INC.
Clerk
>
Contracts / Agreements
>
P
>
SOUTHERN CALIFORNIA PRECISION CONCRETE INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2026 11:49:49 AM
Creation date
4/20/2026 11:49:15 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA PRECISION CONCRETE INC.
Contract #
N-2026-079
Agency
Public Works
Expiration Date
2/22/2027
Insurance Exp Date
6/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Services include the remediation of concrete sidewalk offsets and sidewalk assessment services at various <br /> locations citywide. Project Manager or designee will assign work on as needed basis and per the agreed <br /> upon fee schedule. Pricing is inclusive of all costs, including but not limited to,direct and indirect costs <br /> for labor, overhead, insurance, business expenses, incidental supplies, mileage, fuel/fuel surcharges, and <br /> any other miscellaneous charges. The work completed shall be in compliance with the City's Standard <br /> Plans, Caltrans Standard Plans, the latest version of the Standard Specifications for Public Works <br /> Construction"Greenbook"and as specified in this Scope of Services. <br /> Concrete Remedlation Services <br /> Services include the remediation of concrete sidewalk offsets in designated work areas within the City of <br /> Santa Ana. Services must remove offsets completely, from one end of the raised sidewalk joint to the . <br /> other, if applicable, leaving zero point of differential between concrete slabs. The service provided must <br /> repair each sidewalk offset without damage or visible markings to adjacent slab(s)or curb(s)and shall not <br /> cause any damage to landscaping,retaining walls,curbs,sprinkler heads,utility covers or any other objects <br /> adjacent to sidewalks. Any damages to existing infrastructure shall be repaired or replaced at the <br /> contractor's expense. <br /> 0 EquipmenVProcess Required <br /> Contractor must use a horizontal saw cutting technique that guarantees a planar surface after <br /> cutting. Contractor must guarantee specified repair slope (1:8 or 1:12 based upon requirements <br /> outlined by the City) is achieved. Contractor must guarantee that the removed offset will have a <br /> uniform appearance and texture.The finished surface shall have a coefficient of friction of at least <br /> 0.6 and show via previous testing that the technique used yields the specified coefficient of friction. <br /> The equipment used must be flush to the ground and capable of working at any angle and perform <br /> offset removal in hard-to-reach areas, around obstacles, on narrow walkways, next to fences and <br /> retaining walls or buildings. Grinding or pulverization of the concrete is NOT acceptable or <br /> allowed, causing micro-cracks or weakening the concrete panel. Contractor's offset repairs may <br /> not leave ridges or grooves that could hold water and prevent drainage of rain water or irrigation. <br /> Contractor must use a dust abatement system that limits the dust emitted from the cutting. No <br /> water-cooling is allowed which creates slurry and contaminates storm drains and causes excessive <br /> environmental impact. <br /> All clean-up services must be included in the quotation price and may not be charged at an <br /> additional rate. All clean-up will consist of full clean-up of all debris after each concrete cutting <br /> is performed. All costs incurred for disposal of waste material shall be included in unit cost and <br /> not paid for separately. <br /> • Data Collection <br /> A data collection device that records the details of the work and transmit the data electronically <br /> shall be used. The recording device must be able to record sizes of trip hazards,GPS coordinates, <br /> before and after pictures, hazard locations plotted to a map, address, and also provide this data <br /> electronically in order to integrate into a GIS system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.