My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA PRECISION CONCRETE INC.
Clerk
>
Contracts / Agreements
>
P
>
SOUTHERN CALIFORNIA PRECISION CONCRETE INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2026 11:49:49 AM
Creation date
4/20/2026 11:49:15 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA PRECISION CONCRETE INC.
Contract #
N-2026-079
Agency
Public Works
Expiration Date
2/22/2027
Insurance Exp Date
6/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City of Santa Ana will inspect repairs to ensure the repair specifications are being met. The <br /> contractor at no cost to the City is responsible to fix any failed repairs. <br /> Sidewalk Assessment Services <br /> Services include the inspection of City owned (public right of way)sidewalks,driveway aprons,curb and <br /> gutters and wheelchair ramps in designated areas within the City of Santa Ana and provide a written <br /> inspection report in the format approved by the City. The inspection reports shall include the <br /> identification,location,description of each problem,associated measurements,pictures and recommended <br /> repair method. The format and information required may be changed at the request of City with the <br /> agreement of both parties. <br /> I. Contractor shall inspect public rights-of-way as assigned by the Project Manager or Designee. <br /> 2. Contractor shall use current ADA.standards and City standards in evaluating sidewalk conditions. <br /> 3. Scope of evaluation shall include, but not be limited to the following: <br /> a) Differential vertical displacement between sidewalk sections of 318" inch or greater <br /> b) Spall surfaces, holes in surfaces,and cracks above I inch wide or greater <br /> c) Deteriorated joints that have an eroded condition and are 1f2"wide or greater <br /> 4. Contractor shall record location of damaged sections in a GPS device. <br /> 5. Data entered into the GPS device shall be provided in writing to the City. <br /> 6. Contractor shall provide written inspection report that shall include,but not be limited to: <br /> a) Identification and description of each problem condition <br /> b) Physical address and location including GPS location data <br /> c) Size of the hazards in height, length,and square foot <br /> d) Probable cause of the hazard, if evident <br /> e) Pictures of damaged areas <br /> f) Priority for repair, high,medium, low <br /> g) Recommended action to be taken. <br /> 7. Contractor shall report to the City the results of the inspection upon completion, <br /> Work Hours <br /> The Contractor's activities shall be confined to the following hours: <br /> 7:00 a.m. to 4:00 p.m.,Monday through Friday <br /> Deviation from these hours or weekend work shall not be permitted without the prior consent of the Project <br /> Manager or Designee,except in emergencies involving immediate hazard to persons or property. <br /> Traffic Control <br /> Street closures, detours, signs and barricades used for handling traffic shall conform to the requirements <br /> of latest edition of the"Work Area Traffic Control Handbook"(WATCH),City Standard Plan 1125F(SP <br /> 1125F)and these Special Provisions <br /> Compensation for all traffic control shall be considered paid for under other items of work involved, and <br /> no additional compensation will be allowed therefore. <br /> Invoices <br /> Invoices shall be submitted monthly and shall include description of services performed in accordance <br /> with the fee schedule, All invoices must show the address locations and the type of work performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.