Laserfiche WebLink
City of Santa Ana I First Street Multimodal Corridor <br /> Technical Memorandum <br /> existing conditions of the First Street corridor. This information in conjunction with the <br /> technical multimodal analysis and traffic modeling and community input resulted in the <br /> development of three potential concepts that will improve the travel environment on First <br /> Street. Ultimately, these three concepts will be reviewed by City Council, and a locally <br /> preferred alternative will be selected. The City has funding to advance this alternative into <br /> final design and is in the process of securing funding for construction. <br /> Figure 1. Project Corridor <br /> o _ <br /> N N a <br /> -1 <br /> H O _ C O <br /> m W m m E m 0 <br /> 01 Oil <br /> I I <br /> Signalized Intersections •local Bus Stops •Express Bus Stop% <br /> a o r <br /> 0 <br /> o <br /> �4 lei <br /> ` aT <br /> Figure 2. Examples of Best Street Practices for Pedestrian Facilities <br /> ye. <br /> F4 <br /> • r- I <br /> _ _ r <br /> 2 <br />