My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:36 AM
Creation date
4/29/2026 11:38:58 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
12
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FJ 1� City of Santa Ana I First Street Multimodal Corridor <br /> Technical Memorandum <br /> Funding <br /> The project was funded through a REAP 2.0 grant administered by OCTA and SCAG. The <br /> grant focuses on improving access for low-income housing through improved pedestrian, <br /> bicycle and transit options. While the City did receive a short extension, the grant will expire <br /> in December2026. Additional funding may be needed to complete the design (depending <br /> upon the timing and elements of the locally preferred alternative and the limits of the <br /> improvements). The City is working closely with OCTA to secure additional funding for <br /> construction engineering and construction of the selected improvements. <br /> Goals and Objective <br /> The goal of this project is as follows: <br /> Improve the travel environment along First Street and connect people to places through a <br /> variety of reliable, safe and affordable travel options. <br /> This can be achieved by: <br /> • Prioritizing vulnerable roadway users.The success of implementing improvements <br /> should be measured by its ability to improve safety and accessibility for pedestrians <br /> and bicyclists. <br /> • Reducing vehicle speeds and address basic safety. <br /> • Adding trees and landscape to create shade and make the corridor visually <br /> appealing. Creating a unified design for the corridor will improve the quality of the <br /> travel experience. <br /> • Adding new north-south crossings to improve connectivity across the street. With a <br /> limited number of existing controlled crossings, First Street serves as a barrier <br /> between communities north and south of the corridor. <br /> • Creating a continuous, high-quality bike network that connects to north-south <br /> regional routes. Most bicyclists currently travel on the sidewalk due to safety <br /> concerns riding in the street. Providing wider sidewalks to accommodate either a <br /> Class 1 multiuse path or Class IV bikeways improves safety for both pedestrians and <br /> bicyclists. <br /> • Enhancing and improving transit performance and the rider experience. Provide <br /> features such as dedicated lanes or bus priority to improve the efficiency of buses <br /> along this highly traveled route. <br /> Existing Conditions <br /> Pedestrians and Bicycles <br /> For this analysis, First Street is grouped into three segments, each with distinct <br /> characteristics that coincide with neighborhoods and districts identified in the City's General <br /> Plan. While district boundaries outside the city core are more flexible and may overlap due to <br /> shared characteristics such as architectural style, scale, and overall character,the <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.