My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:36 AM
Creation date
4/29/2026 11:38:58 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
12
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FN City of Santa Ana I First Street Multimodal Corridor <br /> Technical Memorandum <br /> West Side and East Side Conceptt <br /> Due to planned projects along First Street, the corridor was divided into a west side and an <br /> east side when developing concepts. The west side extends from Bristol Street to Zoo Lane, <br /> which aligns with the Caltrans right-of-way. The east side extends from Zoo Lane over the I- <br /> 5 freeway to Tustin Avenue. <br /> Caltrans has developed concept plans for First Street as part of the Freeway Ramp Active <br /> Mobility Enhancement Study (FRAMES), illustrated in Figure 25. Concepts illustrated in this <br /> technical memorandum reflect the recommendations in that report. However, the City is <br /> currently working with Caltrans to identify alternative solutions that align with the concepts <br /> for the west side of the corridor. Modifications to this section may be proposed based on the <br /> ongoing coordination with Caltrans and the locally preferred alternative for this project. <br /> Figure 25. Recommendations in Caltrans FRAMES <br /> - <br /> -- { 1 <br /> B � _, , �,,,.,r �cl.ry •ly.yi9i//I��v tl nc•.r •[,5.�;,.�.;��;rinv <br /> ,. . .. `c w .W no IVPv L[MII. s crs 5 [_.,.Po v[tla ,.uYL•q{.'w!tl`IIfoz.11 r I <br /> J <br /> Source:Caltrans,February 2024. Freew ay Ramp Active Mobility Enhancement Study(FRAMES). <br /> Based on traffic volumes for the existing and future conditions east of 1-5, the concept <br /> developed for the east side of the corridor assumes the four-lane condition. Narrowing the <br /> road to widen the sidewalks builds upon the Public Realm Plan for this area by extending the <br /> curb to construct 17' to 20' wide pedestrian zones.This allows additional improvements <br /> within the pedestrian and bicycle zones as described later in this section and is consistent <br /> with the City's Metro East Mixed-Use Overlay Zone. <br /> A complete set of conceptual layouts for the three West Side and the one East Side concept <br /> is provided as an attachment to this technical memorandum. <br /> 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.