Laserfiche WebLink
First Street Multimodal Boulevard Study <br /> February 17, 2026 <br /> Page 7 <br /> CONCEPT OVERVIEW <br /> Fact sheets for each concept are provided in Exhibits 4, 5, and 6. <br /> Option 1: Multi-Use Path Concept <br /> • Maintains six vehicular travel lanes; <br /> • Introduces shared pedestrian/bicycle path on the south side at the sidewalk level; <br /> • Sidewalk on the north side; <br /> • Maintains existing vehicle capacity but includes shared spaces. <br /> Conceptual View Looking east on First St near Shelton St <br /> P <br /> b <br /> r, C ^] <br /> Q Q <br /> 14' <br /> 10' 76 South <br /> Roadway -na�rd Pedestrian/ <br /> Aryde Path <br /> 100' First St Right-of-way <br />