My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Amendment to the Agreement with Bernards Bros, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 21 - Amendment to the Agreement with Bernards Bros, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:08:54 PM
Creation date
4/29/2026 12:07:53 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
21
Date
5/5/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> B2.1.6 Electrical <br /> • Safe-off Electrical Services in Demolition Area. <br /> • Electrical Demolition Scoping. <br /> • New lighting for Parking Areas and walkways within Limit of Work on City <br /> Electrical Service. <br /> • New lighting for Library exist stairs and enclosed spaces below to be served <br /> off County Service. <br /> • Protection Design of Electrical Service to State Building and underside of <br /> State Building Plaza Level Parking Below. <br /> • State Building lighting will be modified to be kept in Operation Post- <br /> Demolition <br /> • Consultant shall provide lighting design, lighting control, title 24 compliance <br /> forms, and emergency lighting photometrics for the parking lot, accessible <br /> path of travel across the site, and interior spaces related to the Law Library <br /> south stair and enclosed spaces below the law library east stair. <br /> • Consultant shall provide design for an outdoor rated UPS/invertor system for <br /> emergency lighting. <br /> B2.1.7 Permits <br /> • Consultant shall submit plans and specifications for the demolition and <br /> repair permits to the City and also separately to the County for work required <br /> on County Property(Law Library stairs and repair). <br /> • Permits related to the means and methods of demolition will be obtained <br /> through deferred approvals by the to be selected demolition subcontractor. <br /> • Permit Fees will be the responsibility of the City. <br /> B2.1.8 Procedures for safe conduct of the work in the work zone will also be part of <br /> the means and methods, which will be obtained through deferred approvals by the <br /> to be selected demolition subcontractor. <br /> B2.1.9. BIM modeling, where provided will be prepared to Level of Development <br /> (LOD) 200. <br /> B2.2 Project Phases and Submissions for Preparation of Plans and Specs: <br /> B2.2.1 Phase 2 Design Development <br /> SASB PLAZA DEMO ASR 01 B—PART 2 GROUP 4 ARCHITECTURE 2026-02-23 Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.