My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> SCOPE OF WORK <br /> CITY OF SANTA ANA <br /> REQUEST FOR PROPOSALS <br /> FOR <br /> ENVIRONMENTAL, RIGHT-OF WAY & ENGINEERING DESIGN <br /> SERVICES FOR SANTA ANA BLVD. GRADE SEPARATION <br /> RFP NO. 25-131A <br /> INTRODUCTION/PROJECT DESCRIPTION <br /> The Santa Ana Boulevard Grade Separation Project shall improve safety, pedestrian access, and <br /> improve connectivity by separating the existing rail crossing with the Southern California Regional <br /> Rail Authority(SCRRA) Orange Line double tracks at Santa Ana Boulevard adjacent to the Santa <br /> Ana Regional Transportation Center(SARTC)with a new multimodal underpass. The project shall <br /> also reduce the roadway from six- to four-lanes with Class IV protected bikeways and space for <br /> future transit expansion. Furthermore, the project enhances pedestrian access by retaining the <br /> pedestrian crossing at the intersection of Santa Ana Boulevard and Santiago Street and <br /> constructing a new pedestrian bridge spanning over Santa Ana Boulevard, along with sidewalks <br /> on both sides of the overcrossing. The current at-grade crossing and the resulting gate arm down <br /> time of 2.25 hours per day creates significant barriers within the City. The project addresses <br /> transportation challenges for the underserved community and vulnerable road users by improving <br /> safety and air quality, eliminating mobility barriers to reconnection, improving emergency <br /> response times, and increasing accessibility to intercity passenger rail, bus transit, and the future <br /> Orange County Streetcar (OC Streetcar). <br /> The Project shall reconstruct the SCRRA Orange line rail crossing to become a safe, modern, <br /> sustainable, and multimodal hub for economic activity and mobility. The Project involves grade <br /> separating Santa Ana Boulevard and reducing travel lanes from six- to four-lanes, as well as <br /> providing a pedestrian bridge over Santa Ana Boulevard to SARTC, raised medians, protected <br /> bikeways, sidewalks, and space for a pedestrian plaza. This shall improve connectivity to nearby <br /> commercial opportunities and infill housing, SARTC, the SCRRA railroad corridor, Downtown <br /> Santa Ana, Interstate 5 (I-5), and the future OC Streetcar. <br /> At this time, the City is proceeding with development of the Plans, Specifications, and Estimates <br /> (PS&E), Environmental Documentation including Technical Studies, Right-of-Way Engineering <br /> and Acquisition necessary to prepare for construction of the project. <br /> SCOPE OF SERVICES <br /> The following presents the scope of work for the Environmental Revalidation. PS&E.and <br /> Right-of-Way services based upon the selected preferred alternative identified. The selected <br /> Consultant is expected to prepare all reports, studies and plans to meet the requirements of all <br /> affected agencies. City staff shall provide overall project coordination and shall handle <br /> administrative and policy matters. Caltrans, OCTA, SCRRA, the County of Orange, and all other <br /> affected agencies shall provide oversight, guidance and interpretation on matters related to their <br /> respective policies and regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.