My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> E. Deliverables: <br /> Deliverables shall include, but not be limited to, the following: <br /> 1. Plans <br /> • Title sheet with location map <br /> • Typical sections <br /> • Key map and line index <br /> • Disposition and demolition plans <br /> • Roadway design plans and details <br /> • Profiles with super-elevation diagrams <br /> • Construction details and construction notes <br /> • Drainage layouts, profiles, and details <br /> • Signing & Striping plans <br /> • Stage construction and traffic handling plan <br /> • Detour layout plans <br /> • Street light electrical plans and details (temporary and permanent) <br /> • Construction area sign details <br /> • Signal and signal details <br /> • Site control and fencing plan and details <br /> • Safety barriers plan and details <br /> • Sound wall and/or retaining wall plans and details <br /> • NPDES erosion control plans <br /> • Utility relocation plans and details <br /> • Landscaping and Irrigation plans and details <br /> • Structure plans and details <br /> • Water Quality Management Plan (WQMP) <br /> • Storm Water Pollution Plan Preparation (SWPPP) <br /> • Miscellaneous details <br /> • Aesthetic details <br /> 2. Other Deliverables <br /> • Construction Cost Estimate <br /> • Project Special Provisions and Technical Specifications <br /> • Provide a minimally detailed construction Critical Path Method(CPM) schedule to <br /> support the calculation of the number of Working Days for the Project construction. <br /> • All technical studies and reports <br /> — Drainage reports and calculations <br /> — Structural reports and calculations <br /> — Retaining Watl/Sound Wall reports and calculations <br /> — Traffic Management Plan <br /> F. Plan Checks <br /> Consultant shall submit (3) sets of 24-inch x 36-inch and (3) sets of 11-inch x 17- inch <br />
The URL can be used to link to this page
Your browser does not support the video tag.