My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2026 2:30:24 PM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Deliverables: <br />Deliverables shall include, but not be limited to, the following <br />1. Plans <br />• Title sheet with location map <br />• Typical sections <br />• Key map and line index <br />• Disposition and demolition plans <br />• Roadway design plans and details <br />• Profiles with super -elevation diagrams <br />• Construction details and construction notes <br />• Drainage layouts, profiles, and details <br />• Signing & Striping plans <br />• Stage construction and traffic handling plan <br />• Detour layout plans <br />• Street light electrical plans and details (temporary and permanent) <br />• Construction area sign details <br />• Signal and signal details <br />• Site control and fencing plan and details <br />• Safety barriers plan and details <br />• Sound wall and/or retaining wall plans and details <br />• NPDES erosion control plans <br />• Utility relocation plans and details <br />• Landscaping and Irrigation plans and details <br />• Structure plans and details <br />• Water Quality Management Plan (WQMP) <br />• Storm Water Pollution Plan Preparation (SWPPP) <br />• Miscellaneous details <br />• Aesthetic details <br />2. Other Deliverables <br />• Construction Cost Estimate <br />• Project Special Provisions and Technical Specifications <br />• Provide a minimally detailed construction Critical Path Method (CPM) schedule to <br />support the calculation of the number of Working Days for the Project construction. <br />• All technical studies and reports <br />— Drainage reports and calculations <br />— Structural reports and calculations <br />— Retaining Wall/Sound Wall reports and calculations <br />— Traffic Management Plan <br />F. Plan Checks <br />Consultant shall submit (3) sets of 24-inch x 36-inch and (3) sets of 11-inch x 17- inch <br />
The URL can be used to link to this page
Your browser does not support the video tag.