Laserfiche WebLink
Consultant shall prepare a preliminary cost estimate. Throughout development of the PS&E, <br />Consultant shall update this estimate using the City's cost estimate format with the final <br />estimate due with the plans and specifications. If this cost estimate, or any of the updates, <br />exceeds the Project Cost Budget as provided by the City's project manager, Consultant shall <br />recommend and implement alternatives for reducing the project costs to within the budget. <br />A. Roadway Design <br />Roadway or related facilities plans shall be prepared in conformance with the current City <br />Design and Standard Plans for roadway within City right-of-way, and shall be per Caltrans <br />standards and requirements within Caltrans right-of-way. All Roadway plans shall be on <br />single sheet files. Graphic files shall conform to the Caltrans current standards and <br />requirements for Data Formate <br />B. Drainage Design <br />Consultant shall prepare and submit hydrologic and hydraulic analyses to support any <br />required storm drain relocation and realignment. Consultant shall prepare Hydraulics and <br />Hydrology Reports as needed to address existing and proposed drainage conditions and <br />any changes caused by the proposed design including mitigation. Consultant shall <br />investigate hydrologic and hydraulic features of the site as necessary to accommodate the <br />grade separation. <br />Hydraulic and Drainage Engineering, The Consultant's analysis shall be closely <br />coordinated with the affected properties, and agencies, including the County of Orange, <br />Caltrans and SCRRA. The Design Drainage Report shall quantify the magnitude and <br />frequency of design flows from adjacent areas to the PROJECT area, as well as the volumes <br />attributable to the proposed improvements. <br />C. Water Quality Plans <br />Consultant shall prepare a Water Quality Management Plan (WQMP) for the project as <br />required for urban runoff from municipal separate storm sewer systems (MS4 permit). The <br />scope of the WQMP shall include recommendations for post -construction permanent best <br />management practices (BMPs), including source control (structural and non-structural) and <br />treatment BMPs. Recommendations for BMPs shall be incorporated into the project's <br />PS&E. Consultant shall provide base Project data for SWPPP preparation (areas, slopes, <br />etc.). <br />The construction documents shall require the construction Contractor to engage a licensed <br />engineer to prepare a Storm Water Pollution Prevention Plan (SWPPP) for this Project that <br />covers all items within the scope of work. <br />D. Landscape and Irrigation plans <br />Landscape and Irrigation plans shall be prepared in conformance with City's standards and <br />requirements. <br />