Laserfiche WebLink
SCOPE OF SERVICES <br />Task 7 Roadway/Civil Improvements <br />The full suite of roadway, traffic, lighting, utility, <br />drainage and landscape plans will be produced, <br />adhering to the City and SCRRA submittal <br />requirements. <br />7.1 Concept Development <br />Mark Thomas will provide preliminary geometric <br />drawings for the Metrolink "A" submittal (5%) level. <br />The geometric drawings will include the following: <br />• Plans, typical sections, profiles (Santa Ana <br />Boulevard, Fuller Street, Logan Street, <br />entrance to SARTIC). <br />• Plans will generally include geometric <br />conditions, striping configuration, drainage <br />considerations, right of way impacts, and <br />approximate limits of grading. <br />• Any nonstandard design elements will be <br />documented (City, SCRRA) and will be <br />included in a memorandum as part of Task <br />4.1 and 4.2. <br />• Preliminary Bridge Improvement Layout for <br />up to two (2) bridge alternatives. <br />• Preliminary Stage Construction Concept. <br />7.2 Roadway Improvements <br />Mark Thomas will develop the following <br />improvement plans for the standard sequence of <br />35%, 65%, 95%, 100%, and Finale <br />7.2.1 Roadway Plans <br />The following sheets (and number of sheets) are <br />anticipated for the Santa Ana Boulevard <br />Underpass: <br />• Title 1 Index 1 Key Map 1 General Notes (5) <br />• Typical Sections (4) <br />• Disposition and Demolition Plans (5, 20 <br />Scale) <br />• Roadway Design plans Santa Ana <br />Boulevard (4, 20 Scale) <br />• Profiles Santa Ana Boulevard (4, 20 Scale) <br />• Roadway Plan and Profiles Other Streets <br />(9, 20 Scale) <br />• Intersection Grid Details (2, 10 Scale) <br />• Curb Ramp 1 Driveway Details (5, 10 Scale) <br />• Offsite Grading (6, 20 Scale) <br />• Miscellaneous Details (2) <br />CITY OF SANTA ANA l`J <br />SANTA ANA BOULEVARD GRADE SEPARATION <br />MARK THOMAS <br />• Grading Sheets (5, 20 Scale) <br />• Total Sheets: 51 <br />7.2.2 Survey Control Plans <br />Mark Thomas will prepare the Survey Control <br />plans sheets for the 65%, 95%, 100%, and Final <br />submittal phases of the Engineering Design. It is <br />assumed that the following is required: <br />• Survey Control Plan (2) <br />7.2.3 Signing & Striping <br />Mark Thomas will develop signing and striping <br />plans for Santa Ana Boulevard, covering the <br />segment from Santiago Street to Grand Avenue, to <br />support the integration of the grade separation <br />between Santa Ana Boulevard and railroad. <br />• Signing & Striping Plan (1, 40 scale) <br />7.2.4 Staging, Traffic Handling, Detours, Site <br />Control and Fencing Plan <br />Mark Thomas will develop staging and traffic <br />handling plans following the latest CAMUTCD <br />edition. At each stage, at least one travel lane in <br />both directions and pedestrian access along Santa <br />Ana Boulevard will remain open. The detour plans <br />will be based on the latest CAMUTCD edition. The <br />Site Control and Fencing Plan includes identifying <br />right-of-way and easement limits, and applicable <br />railroad agency and city standards, and <br />coordination with the railroad agency and city to <br />confirm site control and fencing requirements. The <br />plan shall identify permanent and temporary site <br />control areas and define required fencing along the <br />rail corridor and construction limits to protect <br />railroad operations, the public, and construction <br />activities. Fencing limits, types, heights, and gate <br />locations shall conform to City standards, railroad <br />standards, and agency's safety requirements. <br />• Stage Construction f Traffic Handling Plans <br />(12, 40 scale) <br />• Detour Plans (2, 200 scale) <br />• Site Control and Fencing Plans (3, 40 <br />scale) <br />• Total Sheets: 17 <br />