My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - TRANSIT ZONING CODE - FEIR - SUPPLEMENTAL - REPONSE TO COMMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
80A - TRANSIT CODE AND STATION DISTRICT - FULL PACKET LISTED INDIVIDUALLY
>
80A - TRANSIT ZONING CODE - FEIR - SUPPLEMENTAL - REPONSE TO COMMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:08:36 PM
Creation date
10/8/2010 4:16:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
6/7/2010
Destruction Year
P
Notes
supplemental EIR Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 12 Responses to Comments Received Since Publication of the t=tnal EIR <br /> Response to Comment ~7.01~ <br /> The comment states that the City did not respond to comments as required by CEQA Guidelines section <br /> 15088(b). Section 15088(b) states that the "lead agency shall provide a written proposed response to a <br /> public agency on comments made by that public agency at least 10 days prior to certifying an <br /> environmental impact report." Written responses were mailed to each commenter, including public <br /> agencies, on May 25th, 2010, more than ten days prior to the June 7, 2010 Joint Session of the Santa Ana <br /> City Council and Communityr Redevelopment Agency. A complete set of comments and responses to the <br /> comments are also provided in the Final EIR. <br /> The City has also complied with all other CEQA requirements for the evaluation and response to <br /> comments on the EIR. Chapter 10 of the Final EIR contains written responses on all environmental <br /> issues raised in comments received from persons who reviewed the Draft EIR during the noticed <br /> comment period from February 2, 2010 to April 12, 2010, and one late comment received on April 13, <br /> 2010. <br /> Response to Comment ~8.01~ <br /> The comment states that the EIR should have been recirculated because significant new information was <br /> added and that the report analyzing the additional alternatives was not recirculated until May 22, 2010. <br /> Draft EIR Chapter 5 (Alternatives), which analyzed an additional three project alternatives and clarified <br /> the project objectives, was recirculated on February 24, 2010. Appendix J, Alternatives Testing: Financial <br /> Analyses, was attached to Draft EIR Chapter 5, and recirculated at the same time. All other changes and <br /> modifications made to the EIR in response to comments are merely clarifications to the EIR and do not <br /> trigger the need for additional public review (Pub. Res. Code ~ 21092.1; CEQA Guidelines X15088.5). <br /> Response to Comment ~8.02~ <br /> The comment states that the EIR should have been recirculated because the Final EIR identified a <br /> significant air quality impact from PMZ, emissions. Significant air qualityT impacts requlrng from PM2~ <br /> emissions is not significant new informarion requiring recirculation under CEQA Guidelines section <br /> 15088.5 because these impacts were identified in the Draft EIR. (Draft EIR Section 4.2.) <br /> Impact 4.2-5 identifies PiVZ, 5 as one of the criteria pollutants that would have a significant impact during <br /> construction of the project (Draft EIR, Section 4.2.3, pages 4.2-28 through 4.2-33.) PiVI,; was <br /> <br /> inadvertently left off the list of criteria pollutants included in the Draft EIR discussion of this impact on <br /> page 4.2-30, but was clearly analyzed and included in the impact conclusion as evidenced in Table 4.2-7, <br /> which includes data, for PM, ~ along with CO, NOX, ROG, SOX, and PM10. The Final EIR was revised to <br /> clarify- the text as follows: <br /> To the extent drat construction of these individual projects overlaps, then the combined emissions <br /> from these small, individual projects could exceed the recommended SCAQ~VID tllresholds, <br /> parricularly for CO, NOx, x~PMi~ and PMT.,, for which tl~e Basin is currently in nonattainment. <br /> (Final EIR, p. 9-16; double-underline indicates text additions from Draft EIR, strikeout indicates <br /> deletions from Draft EIR.) <br /> 12-40 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.