Laserfiche WebLink
Serine Ciandella <br />Proposal for Mitigated Negative Declaration <br />1100 South Grand Avenue <br />April 14, 2010 <br />Page 3 of 4 <br />ix. The general guidelines to prepare the traffic study are presented below. <br />• The City of Santa Ana utilizes the following values in calculating Intersection Capacity <br />Utilizations (ICU's): through lane capacity - 1700 VPHPL; turn lane capacity - 1600 <br />VPHPL; clearance intervals 5%; no defacto for shared lanes. <br />• The City of Santa Ana adopted LOS "D" as the maximum threshold of significance at all <br />intersections and mid-block locations. <br />• Road segments analysis will be determined based on the methodology presented in the <br />Orange County MPAN and the City of Santa Ana Circulation Element. V/C ratios are not <br />used in segments analysis. <br />3. Prepare Mitigation Monitoring Plan <br />The firm shall prepare a Mitigation Monitoring Plan (MMP) for the project to include all accepted <br />mitigation measures and indication of the mitigation measure, project time period to which the measure <br />applies, responsible party and method of monitoring. <br />4. Finalize and Circulate Initial Study/Proposed MND <br />Following review and comment on the Administrative Draft Initial Study/Proposed Mitigated Negative <br />Declaration, the firm shall revise and incorporate comments as appropriate. The firm will circulate the <br />document for public review as directed by the City. In addition, the firm shall assume responsibility for <br />posting the Notice of Intent at the Orange County Clerk's Office. <br />5. Respond to Comments and Prepare Final Mitigated Negative Declaration <br />Following the public review period, the firm shall respond to agency and public comments. These <br />responses and comments will be incorporated into the document and the MND will be finalized for <br />consideration by the Planning Commission and City Council. The firm shall file the Notice of <br />Determination with the County Clerk's Office. <br />6. Attend Meetings <br />The project manager and technical staff will attend all necessary meetings to include public hearings and <br />project coordination meetings. There shall be one project manager who will coordinate with other <br />technical staff, as necessary.