My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-10-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
10/18/2010
>
FULL PACKET_2010-10-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 3:14:35 PM
Creation date
10/14/2010 1:43:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/18/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rejection of Bids For Local <br />Street Slurry Seal 2010 <br />October 18, 201 O <br />Page 2 <br />A total of six bids were received. The lowest bid was submitted by American Asphalt South (AAS) <br />for $845,030, which is above the Engineer's estimate of $693,540. In its bid, AAS indicated that it <br />would use an alternate slurry seal material in lieu of the specified material. The material submitted <br />by AAS was not accepted by City staff. As provided in the specifications, the low bidder requested <br />a hearing with the Executive Director of the Public Works Agency to appeal this decision. A <br />hearing was subsequently held by the Executive Director of the Public Works Agency with all the <br />bidders to review the alternate material proposed by AAS. <br />With the delay caused by the hearing process and the investigation, construction of the project <br />probably would not start until late November or early December, 2010. During that time the <br />temperature will be low and frequent rains may occur during which slurry seal cannot be placed. <br />Based on the above, staff recommends that all bids be rejected and the project will be readvertised <br />early next year. <br />ENVIRONMENTAL IMPACT <br />There is no environmental impact associated with this action. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />Raul Godinez II <br />Executive Director <br />Public Works Agency <br />RG/WA <br />Exhibit 1: Project Location Map <br />23A -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.