LSA ASSOCIATES, INC. INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />JULY 2010 FIRST STREET BRIDGE REPLACEMENT PROJECT <br />CITY OF SANTA ANA <br />overflowing its banks. Throughout Santa Ana River Basin the potential exists for massive <br />downstream flooding resulting from the failure of the Prado Dam, which is located 24 miles north- <br />east of the project site. If Prado Dam failed while at full capacity the project site would be located <br />within the potential flood inundation area. However, the proposed project would not expose people or <br />structures to a significant risk of loss, injury or death involving flooding to a greater extent that under <br />existing project conditions. Therefore, less than significant impact is expected and no mitigation is <br />required. <br />J. Inundation by seiche, tsunami, or mudflow? <br />No impact. The proposed project is located within a developed urban area and there are no water <br />bodies such as lakes or reservoirs that could generate a seiche large enough to inundate the area. The <br />proposed project is located inland, approximately 9.5 miles from the ocean (USGS mapping), and is <br />not within a tsunami zone.' The project site and surrounding area are relatively flat and there are no <br />hillsides or slope areas adjacent to the site that could generate a mudflow. Therefore, no impact <br />related to seiche, tsunami, or mudflow is anticipated to occur in the project area. No mitigation is <br />required. <br />IX. Land Use and Planning <br />Would the project: <br />A. Physically divide an established community? <br />Less than significant impact. The communities around the project site consist mostly of the <br />manufactured housing parks, and apartment complex buildings that are already physically separated <br />by the existing First Street and bridge over Santa Ana River. The proposed project will not change <br />this configuration of the First Street and bridge. The proposed project will widen the First Street by <br />adding one through travel lane in each direction and replace existing bridge structure. The project will <br />also incorporate continuous pedestrian walk along the First Street and Santa Ana Bridge, thus <br />improving the mobility among the manufactured housing park communities. Because the project will <br />implement a sidewalk, it would provide beneficial effects for the surrounding communities. The <br />bridge replacement will be conducted in two phases in order to reduce impacts to traffic. During <br />northern bridge structure replacement, the traffic will continue to use the southern bridge structure. <br />After completion of the northern bridge structure activities, the southern bridge structure will be <br />replaced, and the traffic will utilize the northern bridge structure. Therefore, First Street will remain <br />open during all construction activities. The construction activities will temporarily obstruct the <br />movement of bicycles on the Santa Ana River Trail and therefore will require implementation of the <br />detouring plan. The plan will reduce the temporary construction impacts allowing the cyclists to use <br />nearby streets during the time of construction. Please refer to Section 2.0 for details regarding the <br />detouring plan. Less than significant impacts are anticipated and no mitigation is required. <br />' http://nmviewogc.cr.usgs.gov/viewer.htm (USGS mapping), 2007-08-30. <br />07/25/10 «PA\DMJ070l\MND\4.0 Environmental Analysis.doc <br />411_Ift, <br />4-25 <br />