My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-08-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
08/16/2010
>
FULL PACKET_2010-08-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2016 3:13:06 PM
Creation date
10/19/2010 4:44:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
8/16/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of Santa Ana, Water Resources Division and must be performed according to City <br />Standard Plans and Specifications. Consultant shall repair fire hydrants using original <br />equipment manufactured parts. Consultant shall supply all parts and components <br />necessary to complete work. <br />UPPER BARREL REPAIRS (As -Needed) <br />1. Consultant shall replace all necessary parts and components, excluding bonnet <br />assembly. The City of Santa Ana will determine if a fire hydrant needs to be <br />replaced. <br />2. Disassemble and lubricate entire bonnet area. <br />3. Replace missing or damaged caps. <br />4. Consultant shall warranty all repairs for a period of one (1) year and shall cover <br />entire upper barrel assembly. <br />UPPER BARREL REPLACEMENT (As -Needed) <br />1. Replace entire component (flange, hose nozzle and/or pumper nozzle, and <br />gaskets, missing or deteriorated nuts and bolts, broken traffic flanges and <br />couplings where necessary and as -needed). <br />2. Replace damaged nozzles (hose or pumper) <br />3. Re -caulk and/or secure nozzles, as needed <br />4. Consultant shall warranty all repairs for a period of one (1) year and shall cover <br />entire upper barrel assembly and bonnet. <br />LOWER BARREL REPAIRS (As -Needed) <br />1. Service or repair shall be performed simultaneously with the upper barrel. <br />2. Includes replacement of any/all necessary internal components. <br />3. Lower stem fire hydrant main valve rubber. <br />4. Fire hydrant brass seat ring. <br />5. Main drain parts. <br />6. Consultant shall warranty all repairs for a period of one (1) year and shall cover <br />entire lower and upper barrel assemblies. <br />BONNET REPAIR/REPLACEMENT (As -Needed) <br />1. Replacement/repair of hold down nuts, operating nuts, oil reservoir, o -ring <br />pressure seals, anti -friction washers, damaged bonnet nuts and bolts as <br />required. <br />2. Consultant shall warranty all repairs for a period of one (1) year and shall cover <br />entire bonnet assembly. <br />City Responsibilities: <br />1. City will assign a primary and secondary contact for the fire hydrant maintenance <br />project <br />2. City will provide the Consultant a hydrant maintenance schedule. <br />3. City shall provide laptops with infraMAP software for data collection and <br />recording. <br />CITY OF SANTA ANA FIRE HYDRANT <br />MAINTENANCE SERVICES <br />City of Santa19&� A ater Resources <br />Page 5 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.