My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-63
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2005
>
2005-63
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:26 PM
Creation date
10/20/2010 2:39:22 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
VA04-13 -15CUP
Notes
1702 N Broadway
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for Approval for Conditional Use Permit No. 2004-27 <br />• Conditional Use Permit No. 2004-27 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rip or to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />A. Planning Division <br />All proposed site improvements must conform to the plans submitted for the <br />Planning Commission approval at its August 22, 2005 meeting. <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division, Fire Department, Public Works Agency and Police <br />Department for review. At that time, staff will determine if administrative <br />relief is available or the variance must be amended. <br />• 3. The fuel delivery shall occur between 11:00 p.m. and 5:00 a.m. <br />4. All conditions for this conditional use permit shall be completed and in <br />effect prior to the issuance of the Certificate of Occupancy and the release <br />of any utilities. <br />B. Police Department <br />The existing building and parking lot must conform with the provisions of <br />Chapter 8, Article II, Division 3 of the Santa Ana Municipal Code (Building <br />Security Ordinance). These code conditions will require that the existing <br />project's lighting, door/window locking devices and addressing be <br />upgraded to current code standards. Lighting standards cannot be <br />located in required landscape planters. <br />2. The applicant shall be responsible for maintaining the premises free of <br />graffiti. All graffiti shall be removed within 24 hours of occurrence. <br />3. Cash register must be visible from the street at all times and shall not be <br />obstructed at any time by temporary or permanent signage. <br /> <br />EXHIBIT C <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.