My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2003
>
2003-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:45 PM
Creation date
10/27/2010 3:32:23 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP03-02
Date
3/10/2003
Notes
1301 E Seventeenth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 7. Prepare and submit for staff approval photometric study which study shall <br />extend into the adjacent residential neighborhoods. (Modified by the <br />Planning Commission on March 10, 2003.) <br />8. Staff to review trash enclosure designs to ensure they prevent <br />transmission of odors. (Modified by the Planning Commission on <br />March 10, 2003.) <br />MITIGATION MEASURES <br />9. A combination of berms and hedges need to be provided in the front yard <br />setback area to screen the drive-through aisle and reduce glare onto <br />Seventeenth Street. <br />10. All materials excavated or graded will be sufficiently watered to prevent <br />excessive amount of dust. Watering with complete coverage shall occur <br />at least twice daily, once in the late morning and once after work is done <br />for the day. <br />11. All clearing and earthwork activities shall cease during period of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />• Stage 1 or Stage 2 smog episodes. <br />12. Streets surrounding the project site should be cleaned at the end of each <br />day of construction. <br />13. All materials transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br />14. The amount of area disturbed by clearing and earthwork activities shall be <br />minimized at all times. <br />15. To the extent feasible, equipment engines shall be maintained in good <br />condition and in proper tune according to manufacturer's specifications. <br />16. To the extent feasible, gasoline powered equipment shall be used for on- <br />site and off-site construction activities. <br />17. Prior to issuance of grading permit, the applicant shall submit for review <br />and approval a surface drainage/grading/erosion control plan prepared by <br />a registered Civil Engineer, showing the direction and means of flow to the <br />adjacent street. The plan is to include existing and proposed elevations at <br />and adjacent to all property lines. Drainage routed to the street must be <br />directed beneath the sidewalk and through the curb. <br />• <br />EXHIBIT "A" <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.