Laserfiche WebLink
• 18. Prior to issuance of a grading permit, the applicant shall prepare an <br />NPDES post-construction storm water management plan per Orange <br />County Drainage Area Management Plan (DAMP) that includes all <br />structural and non-structural Best Management Practices. <br />a. Submit and have approved a surface drainage/utility plan that <br />includes all Structural Best Management Practices. <br />b. Provide two copies of the Water Quality Management plan that <br />includes a description of all applicable Structural and Non- <br />structural Best Management Practices, which may apply to this <br />project. <br />19. Building plans shall reflect that the proposed project is fitted with a grease <br />interceptor to the size and capacity as designated by the Building and <br />Safety Division of the City of Santa Ana to Mitigate impacts on the local <br />sanitary sewer system and regional water quality. Such grease <br />interceptor shall be regularly maintained so as to remain fully functional. <br />20. Building plans and Grading plans for the proposed project shall reflect <br />"Construction noise shall be limit to the hours of 7 AM to 8 PM Monday <br />• through Saturday, and not permitted on Sundays or federal holidays". <br />B. Police Department <br />1. All payphones shall be located inside the premises. <br />2. If at a future date the applicant decides to operate between the hours of <br />12:00 midnight and 5:00 a.m., they will be required to apply for the <br />appropriate conditional use permit. <br />3. There shall be no coin-operated games maintained on the premises at any <br />time. <br />• <br />EXHIBIT "A" <br />Page 3 of 3 <br />